MiCharco brings together official measurements, classifications and recorded incidents for the 2 bathing zones of Guía de Isora, Tenerife. All data comes from official sources, with a direct link to each original source.
In addition, there are 6 recorded public actions related to sanitation, wastewater treatment and coastal infrastructure in Guía de Isora. See what's being done
| Latest official status | ||||||
|---|---|---|---|---|---|---|
Guía de Isora · West | Good93 | Open | 7 Sept 2026 15 days ago | E. coli40 Ent.5 | Excellent | 303 mAuthorisation in progress |
Guía de Isora · West | Excellent99 | Open | 7 Sept 2026 15 days ago | E. coli9 Ent.9 | Excellent | 677 mUnauthorised |
Guía de Isora · West
Guía de Isora · West
| Location | Status | Description | Source | |
|---|---|---|---|---|
| 22 Apr 2025 | Guía de Isora | Report | A large brown patch, reported as a likely accumulation of algae, was observed approaching the coastline near Playa San Juan and Los Gigantes. No bathing prohibition or confirmed wastewater contamination was reported. |
A large brown patch, reported as a likely accumulation of algae, was observed approaching the coastline near Playa San Juan and Los Gigantes. No bathing prohibition or confirmed wastewater contamination was reported.
The Island Water Council tenders the operation, conservation and repair of the regional sanitation system between Santiago del Teide and Guía de Isora for three years. The network connects several settlements in western Tenerife and conveys wastewater to the Oeste treatment plant (EDAR Oeste).
An operation and maintenance contract on existing infrastructure. It is not linked to any bathing incident and does not in itself imply any change in water quality.
14 Sept 2026
West · Santiago del Teide · Guía de Isora · Santiago del Teide and Guía de Isora
Tenerife Island Water CouncilPublic institutions
Entemanser has removed around 200 tonnes of wet wipes and other waste from the 34 wastewater pumping stations it operates in Adeje, Guía de Isora and Granadilla de Abona during 2026. The work has required more than 6,500 hours. A build-up of this waste can reduce pump efficiency, cause blockages and, in serious cases, contribute to sewage overflows or discharges.
10 Sept 2026
South · Adeje · Guía de Isora · Granadilla de Abona
EntemanserPublic institutions
The new Tenerife Oeste treatment plant and associated sanitation system entered its operational phase. The system is designed for approximately 109,000 population equivalent and includes the San Juan treatment and pumping facilities, four wastewater pumping stations and associated pipelines.
This infrastructure action does not in itself imply any change in current bathing-water quality.
Investment: Aproximado / Approximate
12 Feb 2026
West · Guía de Isora · Santiago del Teide · Guía de Isora and Santiago del Teide
ACUAES (Aguas de las Cuencas de España)Public institutions
Cabildo de Tenerife (island council)Public institutions
Tenerife Island Water CouncilPublic institutions
ACUAES awarded works to connect Chío to the Tenerife Oeste sanitation system. The project includes approximately 5.3 kilometres of main collector infrastructure and the connection from Chío.
This infrastructure action does not in itself imply any change in current bathing-water quality.
Investment: Aproximado / Approximate
29 Jan 2026
West · Guía de Isora · Chío
ACUAES (Aguas de las Cuencas de España)Public institutions
The Court of Justice of the European Union ruled that Spain had failed to fulfil several obligations under Directive 91/271/EEC in a number of agglomerations covered by case C-433/23, several of them located in Tenerife. The judgment concerns obligations linked to the collection, treatment and monitoring of urban waste water.
A European judgment records past failures and requires them to be corrected. It does not by itself state the situation at any beach on the day it is consulted.
18 Dec 2025
Tenerife · Adeje · Arona · Candelaria · Granadilla de Abona · Guía de Isora · Rosario (El) · Santiago del Teide · San Cristóbal de La Laguna · Santa Cruz de Tenerife
European Union – Court of Justice of the European UnionPublic institutions
The European Commission took Spain to the Court of Justice of the European Union over failures to comply with Directive 91/271/EEC on urban waste water treatment. The case covers several agglomerations in Tenerife, among them Adeje-Arona, Añaza, Candelaria, Golf del Sur, Guía de Isora Litoral, La Esperanza-La Laguna Sur-Santa Cruz-Valles, Puerto de Santiago-Playa la Arena, San Isidro-Litoral, Sueño Azul and Valle de la Orotava.
An infringement procedure is brought against Spain and describes unfulfilled obligations at agglomeration level, not the water quality at a beach on a given day. The required works and connections fall to different administrations.
12 Jul 2023
Tenerife · Adeje · Arona · Candelaria · Granadilla de Abona · Guía de Isora · Rosario (El) · Santiago del Teide · San Cristóbal de La Laguna · Santa Cruz de Tenerife
European Union – Court of Justice of the European UnionPublic institutions