Municipality

Water quality in Guía de Isora

MiCharco brings together official measurements, classifications and recorded incidents for the 2 bathing zones of Guía de Isora, Tenerife. All data comes from official sources, with a direct link to each original source.

Bathing areas
2
With an active situation
0
Last updated
1 Nov 2026

In addition, there are 12 recorded public actions related to sanitation, wastewater treatment and coastal infrastructure in Guía de Isora. See what's being done

Bathing zones in Guía de Isora

View on the map
2 monitored bathing zones

Playa San Juan1

Guía de Isora · West

Good94
Latest test
19 Oct 2026 · 18 days ago
Microbiology
E. coli 9 · Ent. 12
Latest official status
Open
Annual quality
Excellent

Playa y Calas de la Jaquita

Guía de Isora · West

Excellent99
Latest test
19 Oct 2026 · 18 days ago
Microbiology
E. coli 9 · Ent. 2
Latest official status
Open
Annual quality
Excellent

See all Tenerife beaches

Recorded incidents in Guía de Isora

See all incidents
Report
Guía de Isora

A large brown patch, reported as a likely accumulation of algae, was observed approaching the coastline near Playa San Juan and Los Gigantes. No bathing prohibition or confirmed wastewater contamination was reported.

Projects & updates in Guía de Isora

See all actions

Groups rally at Playa San Juan for Teno-Rasca protection

Environmental organisations and local platforms held a land-and-sea mobilisation at Playa San Juan, Guía de Isora, on 31 October 2026. They demand effective protection for the Teno-Rasca marine Special Area of Conservation, limits on urban and tourism pressure, and an end to discharges. These are campaign demands, not official pollution findings or bathing restrictions.

Timeline

  1. 31 Oct 2026

    “Hands off Teno-Rasca” mobilisation held

    Greenpeace confirmed that the mobilisation took place that morning at Playa San Juan, with a floating banner and participation on land and at sea. According to the organisers, around 50 non-motorised craft and more than 100 people ashore took part; EFE reported the release. Claims remain attributed to the organisers and are not an official bathing-water assessment.

    GreenpeaceEFE · Canarias Ahora

  2. 27 Oct 2026

    31 October gathering announced: “Hands off Teno-Rasca!”

    El Digital Sur and the organisers’ release announce a gathering in Playa San Juan on 31 October at 10:30, involving non-motorised craft and a subsequent manifesto reading on land. Named organisers are Abeque, ADNT, ATAN, Canarias tiene un límite, Greenpeace, Ben Magec-EeA, Coordinadora El Rincón-EeA, Salvar El Puertito, Salvar Fonsalía and Salvar Punta Blanca. The groups question several southwest-coast developments; their allegations remain attributed rather than being presented as official findings. The event is announced, not recorded here as having taken place.

    Comunicado de los convocantes · San BorondónEl Digital Sur

Date

27 Oct 2026

Updated 31 Oct 2026

Type
Mobilisation completed
PUBLIC PARTICIPATION
Where

Playa San Juan · Guía de Isora · Tenerife

Who

Tenerife Friends of Nature Association (ATAN)Organiser

Environmental groupsOrganiser

Podemos raises coastal-environment concerns over Costa San Juan

The political party Podemos Canarias has raised concerns about the proposed Costa San Juan tourist project in Playa San Juan (Guía de Isora), according to Tenerife Weekly and El Tambor on 23 September 2026. The party questions the planned drainage system using an absorption well because of its proximity to the protected Teno-Rasca marine area (ZEC Franja Marina Teno-Rasca), and points to possible effects on protected species and habitats. Podemos also argues that the project's 2019 environmental impact statement may no longer be valid and asks the authorities to clarify this. These are the party's statements; no pollution, environmental damage or bathing restriction has been established. This entry is separate from the Playa San Juan wastewater outfall.

Date

23 Sept 2026

Type
Active public complaint
PUBLIC PRESSURE
Where

Guía de Isora · Tenerife

Who

Podemos CanariasOrganiser

Guía de Isora Town CouncilAuthority addressed

Western Tenerife reinforces maintenance of its sanitation network

The Island Water Council tenders the operation, conservation and repair of the regional sanitation system between Santiago del Teide and Guía de Isora for three years. The network connects several settlements in western Tenerife and conveys wastewater to the Oeste treatment plant (EDAR Oeste).

An operation and maintenance contract on existing infrastructure. It is not linked to any bathing incident and does not in itself imply any change in water quality.

Date

14 Sept 2026

Type
In progress
SANITATIONINFRASTRUCTURE
Where

Santiago del Teide and Guía de Isora · Santiago del Teide · Guía de Isora · Tenerife

Who

Tenerife Island Water CouncilPublic institutions

200 tonnes of wet wipes removed from the sewer network in southern Tenerife

Entemanser has removed around 200 tonnes of wet wipes and other waste from the 34 wastewater pumping stations it operates in Adeje, Guía de Isora and Granadilla de Abona during 2026. The work has required more than 6,500 hours. A build-up of this waste can reduce pump efficiency, cause blockages and, in serious cases, contribute to sewage overflows or discharges.

Date

10 Sept 2026

Type
In progress
SEWER NETWORKSANITATION
Where

Adeje · Guía de Isora · Granadilla de Abona · Tenerife

Who

EntemanserPublic institutions

€158 million already executed in Tenerife sanitation programme

ACUAES reported that approximately €158 million had already been executed within the major Tenerife sanitation and wastewater-treatment programme, representing about 67% of planned execution. The update included commissioning work at the Oeste and Los Letrados systems.

This infrastructure action does not in itself imply any change in current bathing-water quality.

Investment: Ejecutados (≈67% de lo previsto) / Executed (≈67% of planned)

Date

20 May 2026

Type
In progress
SANITATIONINFRASTRUCTURE
Where

Guía de Isora · Santiago del Teide · Granadilla de Abona · Arona · San Miguel de Abona · Tenerife

Who

ACUAES (Aguas de las Cuencas de España)Public institutions

Cabildo de Tenerife (island council)Public institutions

Tenerife Island Water CouncilPublic institutions

Tenerife reaches record wastewater treatment capacity with the Granadilla and Guía de Isora plants

El Día reports that the start-up of the Los Letrados plant (Granadilla de Abona) and the Oeste plant (Guía de Isora) raises Tenerife's treatment capacity to more than 35 cubic hectometres a year, over 50% of the island's wastewater flow, extending coverage by more than 80,000 inhabitants. Los Letrados involved an investment of 17.6 million euros and includes 10 kilometres of collectors serving Granadilla town, El Salto and San Isidro, plus an 8.5-kilometre pumping line from the coast (Los Abrigos and La Mareta) to the Ensenada Pelada treatment and pumping station. The article places the works within the Cabildo de Tenerife "zero discharge" strategy and describes Granadilla as a municipality particularly affected by discharges to the sea.

Infrastructure context entry. The article also mentions other works under way (Montaña Reverón in Arona, the Buenos Aires extension in Santa Cruz and the new Punta Brava plant in Puerto de la Cruz) and a joint Acuaes-Cabildo investment of 233.5 million euros. This action does not in itself imply any change in current bathing-water quality.

Investment: Depuradora de Los Letrados, según El Día / Los Letrados plant, per El Día

Date

15 Feb 2026

Type
Completed
TREATMENTSANITATION
Where

Granadilla de Abona · Guía de Isora · Tenerife

Who

ACUAES (Aguas de las Cuencas de España)Public institutions

Ministry for the Ecological Transition and Demographic ChallengePublic institutions

Cabildo de Tenerife (island council)Public institutions

Tenerife Oeste wastewater treatment system enters operation

The new Tenerife Oeste treatment plant and associated sanitation system entered its operational phase. The system is designed for approximately 109,000 population equivalent and includes the San Juan treatment and pumping facilities, four wastewater pumping stations and associated pipelines.

This infrastructure action does not in itself imply any change in current bathing-water quality.

Investment: Aproximado / Approximate

Date

12 Feb 2026

Type
Completed
TREATMENTSANITATION
Where

Guía de Isora and Santiago del Teide · Guía de Isora · Santiago del Teide · Tenerife

Who

ACUAES (Aguas de las Cuencas de España)Public institutions

Cabildo de Tenerife (island council)Public institutions

Tenerife Island Water CouncilPublic institutions

€7 million contract awarded to connect Chío to Tenerife Oeste sanitation system

ACUAES awarded works to connect Chío to the Tenerife Oeste sanitation system. The project includes approximately 5.3 kilometres of main collector infrastructure and the connection from Chío.

This infrastructure action does not in itself imply any change in current bathing-water quality.

Investment: Aproximado / Approximate

Date

29 Jan 2026

Type
Contract awarded
SANITATIONSEWER NETWORK
Where

Chío · Guía de Isora · Tenerife

Who

ACUAES (Aguas de las Cuencas de España)Public institutions

CJEU finds further breaches of the EU Urban Waste Water Treatment Directive affecting Tenerife

The Court of Justice of the European Union ruled that Spain had failed to fulfil several obligations under Directive 91/271/EEC in a number of agglomerations covered by case C-433/23, several of them located in Tenerife. The judgment concerns obligations linked to the collection, treatment and monitoring of urban waste water.

A European judgment records past failures and requires them to be corrected. It does not by itself state the situation at any beach on the day it is consulted.

Date

18 Dec 2025

Type
Court judgment
EU COMPLIANCE
Where

Adeje · Arona · Candelaria · Granadilla de Abona · Guía de Isora · Rosario (El) · Santiago del Teide · San Cristóbal de La Laguna · Santa Cruz de Tenerife · Tenerife

Who

European Union – Court of Justice of the European UnionPublic institutions

Six major projects to reduce wastewater discharges in Tenerife

The Cabildo is advancing six major hydraulic projects across Tenerife as part of a sanitation and wastewater treatment programme aimed at improving wastewater treatment, reducing discharges into the sea and increasing the reuse of treated water.

Date

2 Jul 2025

Type
In progress
SANITATIONINFRASTRUCTURE
Where

Tenerife · Granadilla de Abona · Guía de Isora · Santa Cruz de Tenerife · San Cristóbal de La Laguna · Rosario (El) · Puerto de la Cruz · Orotava (La) · Realejos (Los) · Arafo · Güímar · Candelaria

Who

Cabildo de Tenerife (island council)Public institutions

ACUAES (Aguas de las Cuencas de España)Public institutions

Tenerife Island Water CouncilPublic institutions

€33.6 million approved for six major hydraulic projects

The Cabildo approved €33.6 million to advance six major hydraulic infrastructure projects across Tenerife, including sanitation measures intended to reduce wastewater discharges.

This infrastructure action does not in itself imply any change in current bathing-water quality.

Date

2 Jul 2025

Type
In progress
SANITATIONINFRASTRUCTURE
Where

Granadilla de Abona · Guía de Isora · Santa Cruz de Tenerife · San Cristóbal de La Laguna · Rosario (El) · Puerto de la Cruz · Orotava (La) · Realejos (Los) · Arafo · Güímar · Candelaria · Tenerife

Who

Cabildo de Tenerife (island council)Public institutions

ACUAES (Aguas de las Cuencas de España)Public institutions

Tenerife Island Water CouncilPublic institutions

European Commission refers Spain to the CJEU over wastewater failures affecting Tenerife

The European Commission took Spain to the Court of Justice of the European Union over failures to comply with Directive 91/271/EEC on urban waste water treatment. The case covers several agglomerations in Tenerife, among them Adeje-Arona, Añaza, Candelaria, Golf del Sur, Guía de Isora Litoral, La Esperanza-La Laguna Sur-Santa Cruz-Valles, Puerto de Santiago-Playa la Arena, San Isidro-Litoral, Sueño Azul and Valle de la Orotava.

An infringement procedure is brought against Spain and describes unfulfilled obligations at agglomeration level, not the water quality at a beach on a given day. The required works and connections fall to different administrations.

Date

12 Jul 2023

Type
Under investigation
EU COMPLIANCE
Where

Adeje · Arona · Candelaria · Granadilla de Abona · Guía de Isora · Rosario (El) · Santiago del Teide · San Cristóbal de La Laguna · Santa Cruz de Tenerife · Tenerife

Who

European Union – Court of Justice of the European UnionPublic institutions