Playa Jardin15
Puerto de la Cruz · North
MiCharco brings together official measurements, classifications and recorded incidents for the 3 bathing zones of Puerto de la Cruz, Tenerife. All data comes from official sources, with a direct link to each original source.
In addition, there are 19 recorded public actions related to sanitation, wastewater treatment and coastal infrastructure in Puerto de la Cruz. See what's being done
| Latest official status | ||||||
|---|---|---|---|---|---|---|
Puerto de la Cruz · North | Current situationRecovery | Open | 16 Sept 2026 6 days ago | E. coli9 Ent.2 | Not published | 156 mUnauthorised |
Puerto de la Cruz · North | Very good95 | Open | 7 Sept 2026 15 days ago | E. coli9 Ent.29 | Excellent | 285 mUnauthorised |
Puerto de la Cruz · North | Very good97 | Open | 7 Sept 2026 15 days ago | E. coli9 Ent.9 | Excellent | 78 mUnauthorised |
Puerto de la Cruz · North
Puerto de la Cruz · North
Puerto de la Cruz · North
| Location | Status | Description | Source | |
|---|---|---|---|---|
| 4 Sept 2026 | Puerto de la Cruz | Reopened | Bathing reopened after follow-up analyses confirmed suitable water quality. | |
| 3 Sept 2026 | Puerto de la Cruz | Closed | Temporary bathing prohibition affecting Playa Grande / María Jiménez and El Charcón following unfavourable microbiological analyses. | |
| 14 Aug 2026 | Puerto de la Cruz | Reopened | Bathing restriction lifted after Public Health communicated that the water was suitable for bathing following a new sample. | |
| 12 Aug 2026 | Puerto de la Cruz | Closed | Preventive temporary bathing closure in the Punta Brava section after Public Health reported an unfavourable official analysis. | |
| 22 Jun 2026 | Puerto de la Cruz | Report | A report published by elDiario.es / Canarias Ahora states that a sample taken on 22 June 2026 at El Charcón detected microbiological contamination by E. coli. According to the published report, Public Health had recommended that the Town Council temporarily prohibit bathing, although the beach remained open during the San Juan celebrations. |
Bathing reopened after follow-up analyses confirmed suitable water quality.
Temporary bathing prohibition affecting Playa Grande / María Jiménez and El Charcón following unfavourable microbiological analyses.
Bathing restriction lifted after Public Health communicated that the water was suitable for bathing following a new sample.
Preventive temporary bathing closure in the Punta Brava section after Public Health reported an unfavourable official analysis.
A report published by elDiario.es / Canarias Ahora states that a sample taken on 22 June 2026 at El Charcón detected microbiological contamination by E. coli. According to the published report, Public Health had recommended that the Town Council temporarily prohibit bathing, although the beach remained open during the San Juan celebrations.
A technical report by the Tenerife Island Water Council, dated 18 August 2026, concludes that repairing the existing Punta Brava submarine outfall is not sufficient. According to Canarias Ahora / elDiario.es, published on 21 September 2026, the alternatives studied for repairing the existing infrastructure do not provide an adequate structural solution. Technicians propose constructing a new submarine outfall along a different route, while temporary measures remain in place and wastewater treatment is improved. The proposal does not mean the new infrastructure has been approved, funded or started.
21 Sept 2026
Puerto de la Cruz · Playa Jardín / Punta Brava, Puerto de la Cruz
Tenerife Island Water CouncilImplementing body
Cabildo de Tenerife (island council)Public institutions
Residents of Los Frailes have reported dust, noise and a lack of information during the expansion works at the Punta Brava treatment plant, according to Diario de Avisos. Concerns were also raised regarding earth movements, debris and possible effects on vegetation. Fundación Telesforo Bravo has announced that it will request information about the works and the corresponding permits.
20 Sept 2026
North · Puerto de la Cruz · Los Frailes / Punta Brava
Residents of Los FrailesCivil society
Telesforo Bravo FoundationCivil society
Asamblea Ciudadana Portuense has proposed creating a joint sanitation coordination group involving Puerto de la Cruz, La Orotava, Los Realejos and Santa Úrsula to coordinate assessments, needs and actions related to the regional wastewater system.
The proposal calls for stronger coordination between municipalities and closer monitoring of sanitation infrastructure and water quality. It is a civil society initiative and has not been approved as an official government programme.
19 Sept 2026
North · Puerto de la Cruz · Orotava (La) · Realejos (Los) · Santa Úrsula · Valle de La Orotava
Asamblea Ciudadana PortuenseCivil society
The municipality reported completion of the new sanitation connection allowing wastewater from La Vera, Las Adelfas and upper Los Frailes to flow directly towards the regional EDAR, reducing pressure on coastal pumping stations and the coastal sanitation network.
31 Jul 2026
North · Puerto de la Cruz
Puerto de la Cruz Town CouncilPublic institutions
Construction started on a new sanitation connection allowing wastewater from La Vera, Las Adelfas and upper Los Frailes to be sent towards the regional treatment system instead of passing through coastal pumping infrastructure. The aim is to reduce pressure on the coastal network and lower the risk of overflow discharges.
2 Mar 2026
North · Puerto de la Cruz
Puerto de la Cruz Town CouncilPublic institutions
The Ayuntamiento approved the procurement process for the new water and sanitation concession, including approximately €28.4 million in initial investments for 2026–2027. Planned measures include improvements to wastewater pumping stations, overflow systems and hydraulic infrastructure in Punta Brava.
10 Feb 2026
North · Puerto de la Cruz
Puerto de la Cruz Town CouncilPublic institutions
The Gobierno de Canarias opened the public-information process for modifying the discharge authorisation associated with treated urban wastewater from the Valle de La Orotava EDAR through the Punta Brava submarine outfall.
10 Oct 2025
North · Puerto de la Cruz
Government of the Canary IslandsPublic institutions
Puerto de la Cruz advanced the Plan Director de Abastecimiento y Saneamiento, including the preliminary construction and operation project and the investment programme for the future water and sanitation concession.
9 Jul 2025
North · Puerto de la Cruz
Puerto de la Cruz Town CouncilPublic institutions
The Ayuntamiento reported continued sanitation and stormwater cleaning works in Punta Brava. Measures included new pumps, overflow monitoring and work on the coastal collector as part of efforts to improve the wastewater system affecting the Playa Jardín area.
23 May 2025
North · Puerto de la Cruz
Puerto de la Cruz Town CouncilPublic institutions
The organisation added the Playa Jardín case to its water-conflict register, documenting wastewater pollution and Tenerife sanitation context.
17 May 2025
North · Puerto de la Cruz
Ecologists in ActionCivil society
The Stop Sea Discharges Platform organised a demonstration in Puerto de la Cruz calling for solutions to coastal pollution and the recovery of Playa Jardín.
The mobilisation addressed the authorities with relevant responsibilities, including Puerto de la Cruz Town Council, the Cabildo de Tenerife and the Government of the Canary Islands. This record documents public pressure; it is not a bathing-water incident.
23 Mar 2025
North · Puerto de la Cruz · Playa Jardín
Stop Sea Discharges PlatformOrganiser
Cabildo de Tenerife (island council)Authority addressed
Government of the Canary IslandsAuthority addressed
Puerto de la Cruz Town CouncilAuthority addressed
More than a thousand people took part in a mobilisation called by the Plataforma Stop Vertidos al Mar to demand solutions to the sanitation and discharge problems raised in relation to Playa Jardín.
Record of a citizen mobilisation; it is neither an administrative complaint nor an official action.
1 Mar 2025
North · Puerto de la Cruz · Playa Jardín
Stop Sea Discharges PlatformCivil society
The platform filed a formal complaint concerning discharges on the Puerto de la Cruz coast and requested a review of pumping and treatment facilities.
15 Jan 2025
North · Puerto de la Cruz
Stop Sea Discharges PlatformCivil society
The council started procurement for a set of corrective measures worth around €8 million. The first measure disconnects surplus surface water in La Vera–Las Adelfas, estimated at about €150,000.
Investment: Alrededor de 8 millones de euros; primera medida de unos 150.000 euros
19 Dec 2024
North · Puerto de la Cruz
Puerto de la Cruz Town CouncilPublic institutions
The island water council used a submarine robot over three days to measure the length of the crack in the outfall, after mortar injection had failed.
31 Oct 2024
North · Puerto de la Cruz
Tenerife Island Water CouncilPublic institutions
A municipal compatibility report allows the tender for the expansion of the Punta Brava district treatment plant, valued at €20.8 million with a 24-month construction period.
Investment: 20,8 millones de euros y 24 meses de ejecución
5 Oct 2024
North · Puerto de la Cruz
Tenerife Island Water CouncilPublic institutions
The Cabildo de Tenerife allocates €1 million and the regional ecological transition department contributes €300,000 to connect homes to the sewer network and upgrade it in Punta Brava.
Investment: 1 millón del Cabildo y 300.000 euros del Gobierno de Canarias
2 Oct 2024
North · Puerto de la Cruz
Government of the Canary IslandsPublic institutions
Platform and town council representatives reviewed reports and measures proposed by the responsible public bodies following the bathing-area closure.
7 Aug 2024
North · Puerto de la Cruz
Stop Sea Discharges PlatformCivil society
Puerto de la Cruz Town CouncilPublic institutions
Construction of the main Valle de La Orotava sanitation collectors reached an advanced stage, including works associated with the Cuesta de la Villa pumping station and the infrastructure needed to convey wastewater toward the regional treatment system.
This infrastructure action does not in itself imply any change in current bathing-water quality.
8 May 2024
North · Orotava (La) · Realejos (Los) · Puerto de la Cruz · La Orotava, Los Realejos and Puerto de la Cruz
ACUAES (Aguas de las Cuencas de España)Public institutions
Cabildo de Tenerife (island council)Public institutions
Tenerife Island Water CouncilPublic institutions