Municipality

Water quality in Puerto de la Cruz

MiCharco brings together official measurements, classifications and recorded incidents for the 3 bathing zones of Puerto de la Cruz, Tenerife. All data comes from official sources, with a direct link to each original source.

Bathing areas
3
With an active situation
0
Last updated
5 Nov 2026

In addition, there are 32 recorded public actions related to sanitation, wastewater treatment and coastal infrastructure in Puerto de la Cruz. See what's being done

Bathing zones in Puerto de la Cruz

View on the map
3 monitored bathing zones

Playa Jardin17

Puerto de la Cruz · North

Poor62
Latest test
3 Nov 2026 · 3 days ago
Microbiology
E. coli 29 · Ent. 16
Latest official status
Open
Annual quality
Not published

Playa Martiánez

Puerto de la Cruz · North

Very good95
Latest test
19 Oct 2026 · 18 days ago
Microbiology
E. coli 30 · Ent. 29
Latest official status
Open
Annual quality
Excellent

Playa San Telmo

Puerto de la Cruz · North

Very good98
Latest test
27 Oct 2026 · 10 days ago
Microbiology
E. coli 29 · Ent. 29
Latest official status
Open
Annual quality
Excellent

See all Tenerife beaches

Recorded incidents in Puerto de la Cruz

See all incidents
Reopened
Puerto de la Cruz

Puerto de la Cruz council announced on 9 October that the Playa Grande Centro bathing area at Playa Jardín has reopened after the Directorate-General for Public Health confirmed favourable results. This lifts the bathing prohibition of 7 October.

Closed
Puerto de la Cruz

Bathing was again prohibited at Playa Jardín on 7 October following a microbiological incident, according to Diario de Avisos. Official confirmation of the exact area affected is still pending.

Reopened
Puerto de la Cruz

Puerto de la Cruz council reopened the Playa Grande (Punta Brava) area of Playa Jardín on 1 October after the Canary Islands Directorate-General for Public Health confirmed the water is again suitable for bathing. This lifted the bathing prohibition decreed on 30 September.

Report
Puerto de la Cruz

A report published by elDiario.es / Canarias Ahora states that a sample taken on 22 June 2026 at El Charcón detected microbiological contamination by E. coli. According to the published report, Public Health had recommended that the Town Council temporarily prohibit bathing, although the beach remained open during the San Juan celebrations.

Projects & updates in Puerto de la Cruz

See all actions

Public Health considers a possible prolonged closure of Playa Jardín

After four temporary pollution closures in the last 60 days, the Directorate General of Public Health is considering a possible prolonged closure of Playa Jardín. According to its director general, José Díaz-Flores, this could be considered if the technical assessment finds the water unfit for bathing and the incidents have become recurrent. No decision has been taken.

Timeline

  1. 13 Oct 2026

    Joint sampling following discrepancies in results

    According to the published information, Puerto de la Cruz Council and Public Health will conduct joint sampling at Playa Jardín following discrepancies between results from the council's contracted laboratory and Public Health.

    Diario de Avisos

Date

9 Oct 2026

Updated 13 Oct 2026

Type
Ongoing
MONITORING
Where

Puerto de la Cruz · Tenerife

Who

Public Health, Canary Islands Health ServiceOrganiser

Puerto de la Cruz requests explanations about discrepancies between water tests

Puerto de la Cruz Council stated that its external tests found no breaches, unlike the official Public Health tests. According to the Council, it requested a technical explanation because the samples had been collected barely an hour apart; the external tests have no official validity for determining bathing-water quality.

Timeline

  1. 8 Oct 2026

    Request for joint sampling at Playa Jardín

    Puerto de la Cruz Town Council requested joint sampling with the Canary Islands Government's Public Health department at Playa Jardín, alleging discrepancies between regional and municipal analyses across four closure episodes, and regional department sources said the proposal is being considered.

    Diario de Avisos

Date

1 Oct 2026

Updated 8 Oct 2026

Type
Ongoing
MONITORING
Where

Puerto de la Cruz · Tenerife

Who

Puerto de la Cruz Town CouncilOrganiser

The Cabildo investigates a spill at the Punta Brava wastewater treatment plant

The diluted ferric chloride spill on September 27 at the Punta Brava treatment plant has led Tenerife's Cabildo to propose contractual penalties against Aqualia for access, management and communication deficiencies, according to councillor Blanca Pérez. Pérez says checks did not detect it reaching the sea; proof of corrective measures will be required, with a hearing process for the concessionaire.

Timeline

  1. 30 Oct 2026

    Proposed contractual penalties against Aqualia

    According to councillor Blanca Pérez, the Cabildo proposes €5,400 in contractual penalties against Aqualia for access, management and communication deficiencies concerning the spill, checks did not detect it reaching the sea, and proof of corrective measures will be required, with a hearing process for the concessionaire.

    Canarias Ahora (elDiario.es)

  2. 1 Oct 2026

    Preliminary findings on the protocol and stormwater network

    According to the Cabildo's preliminary findings, Aqualia breached the containment protocol and some liquid entered the stormwater network, while the Island Water Council says its final destination remains unknown and there is no clear evidence it reached the sea.

    El Día

  3. 30 Sept 2026

    PSOE requests municipal participation in proceedings and environmental action

    Puerto de la Cruz PSOE asks the council to join the judicial proceedings concerning the spill, inform residents and request intervention by Environmental Quality authorities, while information cited in the article estimates approximately one thousand litres spilled and suggests some of the product may have reached the stormwater drain.

    Diario de Avisos

Date

27 Sept 2026

Updated 30 Oct 2026

Type
Ongoing
TREATMENT
Where

Puerto de la Cruz · Tenerife

Who

Cabildo de Tenerife (island council)Organiser

Tenerife Island Water CouncilOrganiser

AqualiaAuthority addressed

Emergency replacement of the Punta Brava sewer collector

Puerto de la Cruz Town Council and Aqualia are carrying out the emergency replacement of a deteriorated section of the Punta Brava sewer collector to prevent failures and possible coastal discharges. According to municipal and Aqualia representatives, the new pipe is already installed and complementary works continue with the sewer system operational.

Timeline

  1. 30 Sept 2026

    Aqualia details replacement materials and method

    According to Aqualia, the intervention replaced an elevated cast-iron pipe with a fibre pipe to extend its service life, using manual work to prevent materials from falling.

    Diario de Avisos

  2. 30 Sept 2026

    New pipe installed; complementary works continue

    According to municipal and Aqualia representatives, the new pipe for the Punta Brava sewer collector is already installed and complementary works continue while the sewer system remains operational.

    El Día

  3. 30 Sept 2026

    Request for clarification on Playa Jardín analyses

    Puerto de la Cruz Town Council says it has requested a technical explanation from Public Health about discrepancies with the results of the municipal laboratory contracted for Playa Jardín and states that it continues the preventive replacement of the Punta Brava collector, cleaning and monitoring through independent analyses.

    Canarias Ahora (elDiario.es)

Date

25 Sept 2026

Updated 30 Sept 2026

Type
Contract awarded
EMERGENCY WORKS
Where

Puerto de la Cruz · Tenerife

Who

Puerto de la Cruz Town CouncilPublic institutions

Puerto de la Cruz asks for explanations regarding the wastewater treatment plant

The Sustainable City department of Puerto de la Cruz Town Council has formally requested explanations from the Tenerife Island Water Council, the project promoter and responsible body, and from the contractor carrying out the works, regarding incidents detected during the expansion works at the Punta Brava wastewater treatment plant (Valle de La Orotava regional WWTP). Complaints from residents of the neighbouring Los Frailes housing estate include noise, damage to flora, rubble dumping, bad smells and excess dust. The council asks why the works do not comply with the project's environmental assessment (DAP), which required prior flora and fauna studies, and calls for transplant protocols for the affected Canarian plant species.

Date

21 Sept 2026

Type
Ongoing
TREATMENT
Where

Punta Brava treatment plant (Valle de La Orotava) · Puerto de la Cruz · Tenerife

Who

Puerto de la Cruz Town CouncilOrganiser

Tenerife Island Water CouncilAuthority addressed

Residents of Los FrailesCivil society

Cabildo technicians propose a new outfall for Punta Brava

A technical report by the Tenerife Island Water Council, dated 18 August 2026, concludes that repairing the existing Punta Brava submarine outfall is not sufficient. According to Canarias Ahora / elDiario.es, published on 21 September 2026, the alternatives studied for repairing the existing infrastructure do not provide an adequate structural solution. Technicians propose constructing a new submarine outfall along a different route, while temporary measures remain in place and wastewater treatment is improved. The proposal does not mean the new infrastructure has been approved, funded or started. On 23 September 2026, El Día reported that the awarded repair of about 240 metres of the outfall (awarded to Ferrovial for €2.7 million) must be reconsidered, as the water council's report rejects the studied alternatives as viable solutions. The same day, Cabildo president Rosa Dávila said the island council would follow whatever solution the water council's technicians determine, including a new outfall if they recommend it (Diario de Avisos). No replacement outfall has been approved, funded or started.

Date

21 Sept 2026

Type
Proposed
INFRASTRUCTURESANITATION
Where

Playa Jardín / Punta Brava, Puerto de la Cruz · Puerto de la Cruz · Tenerife

Who

Tenerife Island Water CouncilImplementing body

Cabildo de Tenerife (island council)Public institutions

Residents raise concerns over Punta Brava treatment plant works

Residents of Los Frailes have reported dust, noise and a lack of information during the expansion works at the Punta Brava treatment plant, according to Diario de Avisos. Concerns were also raised regarding earth movements, debris and possible effects on vegetation. Fundación Telesforo Bravo has announced that it will request information about the works and the corresponding permits.

Date

20 Sept 2026

Type
In progress
WORKS
Where

Los Frailes / Punta Brava · Puerto de la Cruz · Tenerife

Who

Residents of Los FrailesCivil society

Telesforo Bravo FoundationCivil society

Joint sanitation coordination group proposed for the Valle de La Orotava

Asamblea Ciudadana Portuense has proposed creating a joint sanitation coordination group involving Puerto de la Cruz, La Orotava, Los Realejos and Santa Úrsula to coordinate assessments, needs and actions related to the regional wastewater system.

The proposal calls for stronger coordination between municipalities and closer monitoring of sanitation infrastructure and water quality. It is a civil society initiative and has not been approved as an official government programme.

Date

19 Sept 2026

Type
Proposed
PUBLIC PARTICIPATION
Where

Valle de La Orotava · Puerto de la Cruz · Orotava (La) · Realejos (Los) · Santa Úrsula · Tenerife

Who

Asamblea Ciudadana PortuenseOrganiser

New La Vera and Las Dehesas sanitation connection completed

The municipality reported completion of the new sanitation connection allowing wastewater from La Vera, Las Adelfas and upper Los Frailes to flow directly towards the regional EDAR, reducing pressure on coastal pumping stations and the coastal sanitation network.

Date

31 Jul 2026

Type
Completed
SANITATION
Where

Puerto de la Cruz · Tenerife

Who

Puerto de la Cruz Town CouncilImplementing body

Stop Vertidos al Mar calls for information on a contamination episode at Playa Jardin

The Punta Brava residents' platform Stop Vertidos al Mar described as "very worrying" that Puerto de la Cruz Town Council did not report a microbiological contamination episode detected at Playa Jardín between 22 and 24 June 2026, nor take preventive measures while water quality was being assessed. Its president, Tania Hernández, argued for transparency when public health is at stake. The platform maintains that the structural sanitation problems at Playa Jardín remain not fully resolved and that some of the committed works are still incomplete or delayed. Recorded as civic action; it is not a scored incident.

Date

29 Jul 2026

Type
In progress
PUBLIC PARTICIPATION
Where

Playa Jardín · Punta Brava · Puerto de la Cruz · Tenerife

Who

Stop Sea Discharges PlatformOrganiser

Puerto de la Cruz Town CouncilAuthority addressed

Works begin to redirect wastewater from La Vera and Las Dehesas

Construction started on a new sanitation connection allowing wastewater from La Vera, Las Adelfas and upper Los Frailes to be sent towards the regional treatment system instead of passing through coastal pumping infrastructure. The aim is to reduce pressure on the coastal network and lower the risk of overflow discharges.

Date

2 Mar 2026

Type
In progress
SANITATION
Where

Puerto de la Cruz · Tenerife

Who

Puerto de la Cruz Town CouncilImplementing body

Court proceedings over the sewage discharges at Playa Jardin

In February 2026 it was reported that court number 2 of the Puerto de la Cruz Court of Instance was investigating five public officials over an alleged environmental offence linked to the sewage discharges at Playa Jardín, in preliminary proceedings opened following a complaint by the Environmental Prosecutor's Office of Santa Cruz de Tenerife after almost a year in which bathing was advised against. A subsequent order of 12 March 2026 provisionally dismissed and closed the case for two of those investigated, councillors David Hernández and Alberto Cabo, finding no indications against them as they held no sanitation responsibilities. Proceedings continued against the other three: Blanca Pérez (Cabildo councillor and CIATF vice-president), Marco Antonio González (former mayor of Puerto de la Cruz) and Javier Davara (CIATF manager). The case is ongoing; there is no conviction.

Date

27 Feb 2026

Type
Under investigation
MONITORING / ENFORCEMENT
Where

Playa Jardín · Puerto de la Cruz · Tenerife

Who

Environmental Prosecutor's Office of Santa Cruz de TenerifeOrganiser

Puerto de la Cruz Town CouncilAuthority addressed

Tenerife Island Water CouncilAuthority addressed

€28.4 million water and sanitation investment programme approved

The Ayuntamiento approved the procurement process for the new water and sanitation concession, including approximately €28.4 million in initial investments for 2026–2027. Planned measures include improvements to wastewater pumping stations, overflow systems and hydraulic infrastructure in Punta Brava.

Date

10 Feb 2026

Type
Announced
SANITATION
Where

Puerto de la Cruz · Tenerife

Who

Puerto de la Cruz Town CouncilOrganiser

Rehabilitation and discharge authorisation update for the Punta Brava outfall

The Government of the Canary Islands processed the amendment to the discharge authorisation for the Valle de La Orotava WWTP via the Punta Brava outfall. Rehabilitation works on the outfall were awarded for €2.7 million; in June 2026, the Directorate-General for Environmental Quality stated in response to objections that, following permits and preparatory filtration well works, completion is now estimated for approximately December 2027.

Investment: Adjudicación de la rehabilitación / Rehabilitation award

Date

10 Oct 2025

Type
In progress
DISCHARGE CONTROL
Where

Puerto de la Cruz · Tenerife

Who

Directorate-General for Environmental QualityOrganiser

Tenerife Island Water CouncilImplementing body

Water and sanitation master plan advances

Puerto de la Cruz advanced the Plan Director de Abastecimiento y Saneamiento, including the preliminary construction and operation project and the investment programme for the future water and sanitation concession.

Date

9 Jul 2025

Type
In progress
INFRASTRUCTURE
Where

Puerto de la Cruz · Tenerife

Who

Puerto de la Cruz Town CouncilOrganiser

Six major projects to reduce wastewater discharges in Tenerife

The Cabildo is advancing six major hydraulic projects across Tenerife as part of a sanitation and wastewater treatment programme aimed at improving wastewater treatment, reducing discharges into the sea and increasing the reuse of treated water.

Date

2 Jul 2025

Type
In progress
SANITATIONINFRASTRUCTURE
Where

Tenerife · Granadilla de Abona · Guía de Isora · Santa Cruz de Tenerife · San Cristóbal de La Laguna · Rosario (El) · Puerto de la Cruz · Orotava (La) · Realejos (Los) · Arafo · Güímar · Candelaria

Who

Cabildo de Tenerife (island council)Public institutions

ACUAES (Aguas de las Cuencas de España)Public institutions

Tenerife Island Water CouncilPublic institutions

€33.6 million approved for six major hydraulic projects

The Cabildo approved €33.6 million to advance six major hydraulic infrastructure projects across Tenerife, including sanitation measures intended to reduce wastewater discharges.

This infrastructure action does not in itself imply any change in current bathing-water quality.

Date

2 Jul 2025

Type
In progress
SANITATIONINFRASTRUCTURE
Where

Granadilla de Abona · Guía de Isora · Santa Cruz de Tenerife · San Cristóbal de La Laguna · Rosario (El) · Puerto de la Cruz · Orotava (La) · Realejos (Los) · Arafo · Güímar · Candelaria · Tenerife

Who

Cabildo de Tenerife (island council)Public institutions

ACUAES (Aguas de las Cuencas de España)Public institutions

Tenerife Island Water CouncilPublic institutions

Sanitation and stormwater works continue in Punta Brava

The Ayuntamiento reported continued sanitation and stormwater cleaning works in Punta Brava. Measures included new pumps, overflow monitoring and work on the coastal collector as part of efforts to improve the wastewater system affecting the Playa Jardín area.

Date

23 May 2025

Type
In progress
SANITATION
Where

Puerto de la Cruz · Tenerife

Who

Puerto de la Cruz Town CouncilImplementing body

More than 45,000 euros in fines for sea discharges in Puerto de la Cruz

A May 2025 report compiled the sanction proceedings opened by the Canary Islands Agency for the Protection of the Natural Environment against Puerto de la Cruz Town Council for discharges to the sea, then totalling around EUR 45,000 in acknowledged fines, including proceedings over the overflow outlets at Playa Jardín, Playa Chica and El Caletón, plus earlier sanctions from 2018 and 2022. The Tenerife Island Water Council was also sanctioned. The report traces the origin of the problem to the break in the Valle de La Orotava district treatment plant outfall since July 2020 and notes that the municipality's main beaches remained closed for close to a year. It is recorded as context and accountability reporting; it creates no new scored incident.

Date

20 May 2025

Type
Announced
MONITORING / ENFORCEMENT
Where

Playa Jardín · Playa Chica · El Caletón · Puerto de la Cruz · Realejos (Los) · Orotava (La) · Tenerife

Who

Canary Islands Agency for the Protection of the Natural EnvironmentOrganiser

Puerto de la Cruz Town CouncilAuthority addressed

Publication of a documented investigation into Playa Jardín pollution

The organisation added the Playa Jardín case to its water-conflict register, documenting wastewater pollution and Tenerife sanitation context.

Date

17 May 2025

Type
Completed
INVESTIGATION / MONITORING
Where

Puerto de la Cruz · Tenerife

Who

Ecologists in ActionCivil society

Regenerated water from the Valle de La Orotava plant for the La Cruz Santa reservoir

Works at the Valle de La Orotava treatment plant in Punta Brava will allow up to 6,600 cubic metres per day of regenerated water to be supplied to the La Cruz Santa reservoir for agricultural irrigation in Los Realejos and the Valle de La Orotava. Phase 1 already uses membrane bioreactor (MBR) secondary treatment, and phase 2, under way, adds reverse electrodialysis tertiary treatment. Balten is building the connecting pipeline between the plant and the reservoir; pumping was expected to start in June 2025.

Date

22 Apr 2025

Type
In progress
TREATMENT
Where

La Cruz Santa reservoir · Los Realejos · Valle de La Orotava treatment plant · Puerto de la Cruz · Tenerife

Who

Los Realejos Town CouncilOrganiser

Cabildo de Tenerife (island council)Implementing body

Mobilisation calling for an end to discharges and the recovery of Playa Jardín

The Stop Sea Discharges Platform organised a demonstration in Puerto de la Cruz calling for solutions to coastal pollution and the recovery of Playa Jardín.

The mobilisation addressed the authorities with relevant responsibilities, including Puerto de la Cruz Town Council, the Cabildo de Tenerife and the Government of the Canary Islands. This record documents public pressure; it is not a bathing-water incident.

Date

23 Mar 2025

Type
Completed
PUBLIC PRESSURE
Where

Playa Jardín · Puerto de la Cruz · Tenerife

Who

Stop Sea Discharges PlatformOrganiser

Cabildo de Tenerife (island council)Authority addressed

Government of the Canary IslandsAuthority addressed

Puerto de la Cruz Town CouncilAuthority addressed

More than a thousand people call for solutions to the Playa Jardín discharges

More than a thousand people took part in a mobilisation called by the Plataforma Stop Vertidos al Mar to demand solutions to the sanitation and discharge problems raised in relation to Playa Jardín.

Record of a citizen mobilisation; it is neither an administrative complaint nor an official action.

Date

1 Mar 2025

Type
Mobilisation completed
CITIZEN ACTION
Where

Playa Jardín · Puerto de la Cruz · Tenerife

Who

Stop Sea Discharges PlatformOrganiser

Complaint to Seprona over wastewater discharges on the coast

The platform filed a formal complaint concerning discharges on the Puerto de la Cruz coast and requested a review of pumping and treatment facilities.

Date

15 Jan 2025

Type
Completed
INVESTIGATION / MONITORING
Where

Puerto de la Cruz · Tenerife

Who

Stop Sea Discharges PlatformCivil society

Major state-backed Tenerife sanitation programme expanded

The wider Tenerife sanitation programme was expanded to cover major regional systems including Arona Este, Tenerife Oeste, Acentejo, Granadilla and Valle de La Orotava, together with further works in Puerto de la Cruz and future infrastructure in Isla Baja.

This infrastructure action does not in itself imply any change in current bathing-water quality.

Date

9 Jan 2025

Type
In progress
FUNDINGSANITATION
Where

San Cristóbal de La Laguna · Tegueste · Tacoronte · Santa Cruz de Tenerife · Arico · Puerto de la Cruz · Icod de los Vinos · La Guancha · San Juan de la Rambla · Tenerife

Who

Cabildo de Tenerife (island council)Public institutions

Ministry for the Ecological Transition and Demographic ChallengePublic institutions

ACUAES (Aguas de las Cuencas de España)Public institutions

Municipal investment of €8 million to address the discharge crisis

The council started procurement for a set of corrective measures worth around €8 million. The first measure disconnects surplus surface water in La Vera–Las Adelfas, estimated at about €150,000.

Investment: Alrededor de 8 millones de euros; primera medida de unos 150.000 euros

Date

19 Dec 2024

Type
Announced
EMERGENCY WORKS
Where

Puerto de la Cruz · Tenerife

Who

Puerto de la Cruz Town CouncilPublic institutions

Robotic inspection of the Punta Brava submarine outfall

The island water council used a submarine robot over three days to measure the length of the crack in the outfall, after mortar injection had failed.

Date

31 Oct 2024

Type
In progress
INVESTIGATION / MONITORING
Where

Puerto de la Cruz · Tenerife

Who

Tenerife Island Water CouncilPublic institutions

Expansion of the Punta Brava district treatment plant

A municipal compatibility report allows the tender for the expansion of the Punta Brava district treatment plant, valued at €20.8 million with a 24-month construction period.

Investment: 20,8 millones de euros y 24 meses de ejecución

Date

5 Oct 2024

Type
Planned
TREATMENT
Where

Puerto de la Cruz · Tenerife

Who

Tenerife Island Water CouncilPublic institutions

Punta Brava sanitation upgrade with €1.3 million

The Cabildo de Tenerife allocates €1 million and the regional ecological transition department contributes €300,000 to connect homes to the sewer network and upgrade it in Punta Brava.

Investment: 1 millón del Cabildo y 300.000 euros del Gobierno de Canarias

Date

2 Oct 2024

Type
In progress
SEWER NETWORK
Where

Puerto de la Cruz · Tenerife

Who

Government of the Canary IslandsPublic institutions

Meeting on measures linked to the Playa Jardín closure

Platform and town council representatives reviewed reports and measures proposed by the responsible public bodies following the bathing-area closure.

Date

7 Aug 2024

Type
Completed
INVESTIGATION / MONITORING
Where

Puerto de la Cruz · Tenerife

Who

Stop Sea Discharges PlatformCivil society

Puerto de la Cruz Town CouncilPublic institutions

Valle de La Orotava main sanitation collectors reach final construction phase

Construction of the main Valle de La Orotava sanitation collectors reached an advanced stage, including works associated with the Cuesta de la Villa pumping station and the infrastructure needed to convey wastewater toward the regional treatment system.

This infrastructure action does not in itself imply any change in current bathing-water quality.

Date

8 May 2024

Type
In progress
SANITATIONSEWER NETWORK
Where

La Orotava, Los Realejos and Puerto de la Cruz · Orotava (La) · Realejos (Los) · Puerto de la Cruz · Tenerife

Who

ACUAES (Aguas de las Cuencas de España)Public institutions

Cabildo de Tenerife (island council)Public institutions

Tenerife Island Water CouncilPublic institutions

Valle de La Orotava wastewater system designed to substantially increase treatment capacity

The planned Valle de La Orotava wastewater system was designed to significantly increase regional treatment capacity. Main collectors in La Orotava and Los Realejos were already under construction and the first treatment-plant phase was designed for around 10,000 cubic metres per day.

This infrastructure action does not in itself imply any change in current bathing-water quality.

Date

14 Nov 2022

Type
In progress
TREATMENTSANITATION
Where

Valle de La Orotava · La Orotava · Orotava (La) · Puerto de la Cruz · Realejos (Los) · Santa Úrsula · Tenerife

Who

Tenerife Island Water CouncilPublic institutions