Municipality

Water quality in Puerto de la Cruz

MiCharco brings together official measurements, classifications and recorded incidents for the 3 bathing zones of Puerto de la Cruz, Tenerife. All data comes from official sources, with a direct link to each original source.

Bathing areas
3
With an active situation
1
Last updated
21 Sept 2026

In addition, there are 19 recorded public actions related to sanitation, wastewater treatment and coastal infrastructure in Puerto de la Cruz. See what's being done

Bathing zones in Puerto de la Cruz

View on the map
3 monitored bathing zones

Playa Jardin15

Puerto de la Cruz · North

Current situationRecovery
Latest test
16 Sept 2026 · 6 days ago
Microbiology
E. coli 9 · Ent. 2
Latest official status
Open
Annual quality
Not published

Playa Martiánez

Puerto de la Cruz · North

Very good95
Latest test
7 Sept 2026 · 15 days ago
Microbiology
E. coli 9 · Ent. 29
Latest official status
Open
Annual quality
Excellent

Playa San Telmo

Puerto de la Cruz · North

Very good97
Latest test
7 Sept 2026 · 15 days ago
Microbiology
E. coli 9 · Ent. 9
Latest official status
Open
Annual quality
Excellent

See all Tenerife beaches

Recorded incidents in Puerto de la Cruz

See all incidents
Report
Puerto de la Cruz

A report published by elDiario.es / Canarias Ahora states that a sample taken on 22 June 2026 at El Charcón detected microbiological contamination by E. coli. According to the published report, Public Health had recommended that the Town Council temporarily prohibit bathing, although the beach remained open during the San Juan celebrations.

Measures & Projects in Puerto de la Cruz

See all actions

Cabildo technicians propose a new outfall for Punta Brava

A technical report by the Tenerife Island Water Council, dated 18 August 2026, concludes that repairing the existing Punta Brava submarine outfall is not sufficient. According to Canarias Ahora / elDiario.es, published on 21 September 2026, the alternatives studied for repairing the existing infrastructure do not provide an adequate structural solution. Technicians propose constructing a new submarine outfall along a different route, while temporary measures remain in place and wastewater treatment is improved. The proposal does not mean the new infrastructure has been approved, funded or started.

Date

21 Sept 2026

Type
Proposed
INFRASTRUCTURESANITATION
Where

Puerto de la Cruz · Playa Jardín / Punta Brava, Puerto de la Cruz

Who

Tenerife Island Water CouncilImplementing body

Cabildo de Tenerife (island council)Public institutions

Residents raise concerns over Punta Brava treatment plant works

Residents of Los Frailes have reported dust, noise and a lack of information during the expansion works at the Punta Brava treatment plant, according to Diario de Avisos. Concerns were also raised regarding earth movements, debris and possible effects on vegetation. Fundación Telesforo Bravo has announced that it will request information about the works and the corresponding permits.

Date

20 Sept 2026

Type
In progress
WORKS
Where

North · Puerto de la Cruz · Los Frailes / Punta Brava

Who

Residents of Los FrailesCivil society

Telesforo Bravo FoundationCivil society

Joint sanitation coordination group proposed for the Valle de La Orotava

Asamblea Ciudadana Portuense has proposed creating a joint sanitation coordination group involving Puerto de la Cruz, La Orotava, Los Realejos and Santa Úrsula to coordinate assessments, needs and actions related to the regional wastewater system.

The proposal calls for stronger coordination between municipalities and closer monitoring of sanitation infrastructure and water quality. It is a civil society initiative and has not been approved as an official government programme.

Date

19 Sept 2026

Type
Proposed
PUBLIC PARTICIPATION
Where

North · Puerto de la Cruz · Orotava (La) · Realejos (Los) · Santa Úrsula · Valle de La Orotava

Who

Asamblea Ciudadana PortuenseCivil society

New La Vera and Las Dehesas sanitation connection completed

The municipality reported completion of the new sanitation connection allowing wastewater from La Vera, Las Adelfas and upper Los Frailes to flow directly towards the regional EDAR, reducing pressure on coastal pumping stations and the coastal sanitation network.

Date

31 Jul 2026

Type
Completed
SANITATION
Where

North · Puerto de la Cruz

Who

Puerto de la Cruz Town CouncilPublic institutions

Works begin to redirect wastewater from La Vera and Las Dehesas

Construction started on a new sanitation connection allowing wastewater from La Vera, Las Adelfas and upper Los Frailes to be sent towards the regional treatment system instead of passing through coastal pumping infrastructure. The aim is to reduce pressure on the coastal network and lower the risk of overflow discharges.

Date

2 Mar 2026

Type
In progress
SANITATION
Where

North · Puerto de la Cruz

Who

Puerto de la Cruz Town CouncilPublic institutions

€28.4 million water and sanitation investment programme approved

The Ayuntamiento approved the procurement process for the new water and sanitation concession, including approximately €28.4 million in initial investments for 2026–2027. Planned measures include improvements to wastewater pumping stations, overflow systems and hydraulic infrastructure in Punta Brava.

Date

10 Feb 2026

Type
Announced
SANITATION
Where

North · Puerto de la Cruz

Who

Puerto de la Cruz Town CouncilPublic institutions

Modification of the Punta Brava outfall authorisation enters public consultation

The Gobierno de Canarias opened the public-information process for modifying the discharge authorisation associated with treated urban wastewater from the Valle de La Orotava EDAR through the Punta Brava submarine outfall.

Date

10 Oct 2025

Type
In progress
DISCHARGE CONTROL
Where

North · Puerto de la Cruz

Who

Government of the Canary IslandsPublic institutions

Water and sanitation master plan advances

Puerto de la Cruz advanced the Plan Director de Abastecimiento y Saneamiento, including the preliminary construction and operation project and the investment programme for the future water and sanitation concession.

Date

9 Jul 2025

Type
In progress
INFRASTRUCTURE
Where

North · Puerto de la Cruz

Who

Puerto de la Cruz Town CouncilPublic institutions

Sanitation and stormwater works continue in Punta Brava

The Ayuntamiento reported continued sanitation and stormwater cleaning works in Punta Brava. Measures included new pumps, overflow monitoring and work on the coastal collector as part of efforts to improve the wastewater system affecting the Playa Jardín area.

Date

23 May 2025

Type
In progress
SANITATION
Where

North · Puerto de la Cruz

Who

Puerto de la Cruz Town CouncilPublic institutions

Publication of a documented investigation into Playa Jardín pollution

The organisation added the Playa Jardín case to its water-conflict register, documenting wastewater pollution and Tenerife sanitation context.

Date

17 May 2025

Type
Completed
INVESTIGATION / MONITORING
Where

North · Puerto de la Cruz

Who

Ecologists in ActionCivil society

Mobilisation calling for an end to discharges and the recovery of Playa Jardín

The Stop Sea Discharges Platform organised a demonstration in Puerto de la Cruz calling for solutions to coastal pollution and the recovery of Playa Jardín.

The mobilisation addressed the authorities with relevant responsibilities, including Puerto de la Cruz Town Council, the Cabildo de Tenerife and the Government of the Canary Islands. This record documents public pressure; it is not a bathing-water incident.

Date

23 Mar 2025

Type
Completed
PUBLIC PRESSURE
Where

North · Puerto de la Cruz · Playa Jardín

Who

Stop Sea Discharges PlatformOrganiser

Cabildo de Tenerife (island council)Authority addressed

Government of the Canary IslandsAuthority addressed

Puerto de la Cruz Town CouncilAuthority addressed

More than a thousand people call for solutions to the Playa Jardín discharges

More than a thousand people took part in a mobilisation called by the Plataforma Stop Vertidos al Mar to demand solutions to the sanitation and discharge problems raised in relation to Playa Jardín.

Record of a citizen mobilisation; it is neither an administrative complaint nor an official action.

Date

1 Mar 2025

Type
Mobilisation completed
CITIZEN ACTION
Where

North · Puerto de la Cruz · Playa Jardín

Who

Stop Sea Discharges PlatformCivil society

Complaint to Seprona over wastewater discharges on the coast

The platform filed a formal complaint concerning discharges on the Puerto de la Cruz coast and requested a review of pumping and treatment facilities.

Date

15 Jan 2025

Type
Completed
INVESTIGATION / MONITORING
Where

North · Puerto de la Cruz

Who

Stop Sea Discharges PlatformCivil society

Municipal investment of €8 million to address the discharge crisis

The council started procurement for a set of corrective measures worth around €8 million. The first measure disconnects surplus surface water in La Vera–Las Adelfas, estimated at about €150,000.

Investment: Alrededor de 8 millones de euros; primera medida de unos 150.000 euros

Date

19 Dec 2024

Type
Announced
EMERGENCY WORKS
Where

North · Puerto de la Cruz

Who

Puerto de la Cruz Town CouncilPublic institutions

Robotic inspection of the Punta Brava submarine outfall

The island water council used a submarine robot over three days to measure the length of the crack in the outfall, after mortar injection had failed.

Date

31 Oct 2024

Type
In progress
INVESTIGATION / MONITORING
Where

North · Puerto de la Cruz

Who

Tenerife Island Water CouncilPublic institutions

Expansion of the Punta Brava district treatment plant

A municipal compatibility report allows the tender for the expansion of the Punta Brava district treatment plant, valued at €20.8 million with a 24-month construction period.

Investment: 20,8 millones de euros y 24 meses de ejecución

Date

5 Oct 2024

Type
Planned
TREATMENT
Where

North · Puerto de la Cruz

Who

Tenerife Island Water CouncilPublic institutions

Punta Brava sanitation upgrade with €1.3 million

The Cabildo de Tenerife allocates €1 million and the regional ecological transition department contributes €300,000 to connect homes to the sewer network and upgrade it in Punta Brava.

Investment: 1 millón del Cabildo y 300.000 euros del Gobierno de Canarias

Date

2 Oct 2024

Type
In progress
SEWER NETWORK
Where

North · Puerto de la Cruz

Who

Government of the Canary IslandsPublic institutions

Meeting on measures linked to the Playa Jardín closure

Platform and town council representatives reviewed reports and measures proposed by the responsible public bodies following the bathing-area closure.

Date

7 Aug 2024

Type
Completed
INVESTIGATION / MONITORING
Where

North · Puerto de la Cruz

Who

Stop Sea Discharges PlatformCivil society

Puerto de la Cruz Town CouncilPublic institutions

Valle de La Orotava main sanitation collectors reach final construction phase

Construction of the main Valle de La Orotava sanitation collectors reached an advanced stage, including works associated with the Cuesta de la Villa pumping station and the infrastructure needed to convey wastewater toward the regional treatment system.

This infrastructure action does not in itself imply any change in current bathing-water quality.

Date

8 May 2024

Type
In progress
SANITATIONSEWER NETWORK
Where

North · Orotava (La) · Realejos (Los) · Puerto de la Cruz · La Orotava, Los Realejos and Puerto de la Cruz

Who

ACUAES (Aguas de las Cuencas de España)Public institutions

Cabildo de Tenerife (island council)Public institutions

Tenerife Island Water CouncilPublic institutions