Playa Jardin17
Puerto de la Cruz · North
MiCharco brings together official measurements, classifications and recorded incidents for the 3 bathing zones of Puerto de la Cruz, Tenerife. All data comes from official sources, with a direct link to each original source.
In addition, there are 32 recorded public actions related to sanitation, wastewater treatment and coastal infrastructure in Puerto de la Cruz. See what's being done
| Latest official status | ||||||
|---|---|---|---|---|---|---|
Puerto de la Cruz · North | Poor62 | Open | 3 Nov 2026 3 days ago | E. coli29 Ent.16 | Not published | 156 mUnauthorised |
Puerto de la Cruz · North | Very good95 | Open | 19 Oct 2026 18 days ago | E. coli30 Ent.29 | Excellent | 285 mUnauthorised |
Puerto de la Cruz · North | Very good98 | Open | 27 Oct 2026 10 days ago | E. coli29 Ent.29 | Excellent | 78 mUnauthorised |
Puerto de la Cruz · North
Puerto de la Cruz · North
Puerto de la Cruz · North
| Location | Status | Description | Source | |
|---|---|---|---|---|
| 9 Oct 2026 | Puerto de la Cruz | Reopened | Puerto de la Cruz council announced on 9 October that the Playa Grande Centro bathing area at Playa Jardín has reopened after the Directorate-General for Public Health confirmed favourable results. This lifts the bathing prohibition of 7 October. | |
| 7 Oct 2026 | Puerto de la Cruz | Closed | Bathing was again prohibited at Playa Jardín on 7 October following a microbiological incident, according to Diario de Avisos. Official confirmation of the exact area affected is still pending. | |
| 1 Oct 2026 | Puerto de la Cruz | Reopened | Puerto de la Cruz council reopened the Playa Grande (Punta Brava) area of Playa Jardín on 1 October after the Canary Islands Directorate-General for Public Health confirmed the water is again suitable for bathing. This lifted the bathing prohibition decreed on 30 September. | |
| 30 Sept 2026 | Puerto de la Cruz | Closed | Bathing prohibited after public health tests detected excessive E. coli levels. | |
| 4 Sept 2026 | Puerto de la Cruz | Reopened | Bathing reopened after follow-up analyses confirmed suitable water quality. | |
| 3 Sept 2026 | Puerto de la Cruz | Closed | Temporary bathing prohibition affecting Playa Grande / María Jiménez and El Charcón following unfavourable microbiological analyses. | |
| 14 Aug 2026 | Puerto de la Cruz | Reopened | Bathing restriction lifted after Public Health communicated that the water was suitable for bathing following a new sample. | |
| 12 Aug 2026 | Puerto de la Cruz | Closed | Preventive temporary bathing closure in the Punta Brava section after Public Health reported an unfavourable official analysis. | |
| 22 Jun 2026 | Puerto de la Cruz | Report | A report published by elDiario.es / Canarias Ahora states that a sample taken on 22 June 2026 at El Charcón detected microbiological contamination by E. coli. According to the published report, Public Health had recommended that the Town Council temporarily prohibit bathing, although the beach remained open during the San Juan celebrations. |
Puerto de la Cruz council announced on 9 October that the Playa Grande Centro bathing area at Playa Jardín has reopened after the Directorate-General for Public Health confirmed favourable results. This lifts the bathing prohibition of 7 October.
Bathing was again prohibited at Playa Jardín on 7 October following a microbiological incident, according to Diario de Avisos. Official confirmation of the exact area affected is still pending.
Puerto de la Cruz council reopened the Playa Grande (Punta Brava) area of Playa Jardín on 1 October after the Canary Islands Directorate-General for Public Health confirmed the water is again suitable for bathing. This lifted the bathing prohibition decreed on 30 September.
Bathing prohibited after public health tests detected excessive E. coli levels.
Bathing reopened after follow-up analyses confirmed suitable water quality.
Temporary bathing prohibition affecting Playa Grande / María Jiménez and El Charcón following unfavourable microbiological analyses.
Bathing restriction lifted after Public Health communicated that the water was suitable for bathing following a new sample.
Preventive temporary bathing closure in the Punta Brava section after Public Health reported an unfavourable official analysis.
A report published by elDiario.es / Canarias Ahora states that a sample taken on 22 June 2026 at El Charcón detected microbiological contamination by E. coli. According to the published report, Public Health had recommended that the Town Council temporarily prohibit bathing, although the beach remained open during the San Juan celebrations.
After four temporary pollution closures in the last 60 days, the Directorate General of Public Health is considering a possible prolonged closure of Playa Jardín. According to its director general, José Díaz-Flores, this could be considered if the technical assessment finds the water unfit for bathing and the incidents have become recurrent. No decision has been taken.
Timeline
13 Oct 2026
Joint sampling following discrepancies in results
According to the published information, Puerto de la Cruz Council and Public Health will conduct joint sampling at Playa Jardín following discrepancies between results from the council's contracted laboratory and Public Health.
9 Oct 2026
Updated 13 Oct 2026
Puerto de la Cruz · Tenerife
Public Health, Canary Islands Health ServiceOrganiser
Puerto de la Cruz Council stated that its external tests found no breaches, unlike the official Public Health tests. According to the Council, it requested a technical explanation because the samples had been collected barely an hour apart; the external tests have no official validity for determining bathing-water quality.
Timeline
8 Oct 2026
Request for joint sampling at Playa Jardín
Puerto de la Cruz Town Council requested joint sampling with the Canary Islands Government's Public Health department at Playa Jardín, alleging discrepancies between regional and municipal analyses across four closure episodes, and regional department sources said the proposal is being considered.
1 Oct 2026
Updated 8 Oct 2026
Puerto de la Cruz · Tenerife
Puerto de la Cruz Town CouncilOrganiser
The diluted ferric chloride spill on September 27 at the Punta Brava treatment plant has led Tenerife's Cabildo to propose contractual penalties against Aqualia for access, management and communication deficiencies, according to councillor Blanca Pérez. Pérez says checks did not detect it reaching the sea; proof of corrective measures will be required, with a hearing process for the concessionaire.
Timeline
30 Oct 2026
Proposed contractual penalties against Aqualia
According to councillor Blanca Pérez, the Cabildo proposes €5,400 in contractual penalties against Aqualia for access, management and communication deficiencies concerning the spill, checks did not detect it reaching the sea, and proof of corrective measures will be required, with a hearing process for the concessionaire.
1 Oct 2026
Preliminary findings on the protocol and stormwater network
According to the Cabildo's preliminary findings, Aqualia breached the containment protocol and some liquid entered the stormwater network, while the Island Water Council says its final destination remains unknown and there is no clear evidence it reached the sea.
30 Sept 2026
PSOE requests municipal participation in proceedings and environmental action
Puerto de la Cruz PSOE asks the council to join the judicial proceedings concerning the spill, inform residents and request intervention by Environmental Quality authorities, while information cited in the article estimates approximately one thousand litres spilled and suggests some of the product may have reached the stormwater drain.
27 Sept 2026
Updated 30 Oct 2026
Puerto de la Cruz · Tenerife
Cabildo de Tenerife (island council)Organiser
Tenerife Island Water CouncilOrganiser
AqualiaAuthority addressed
Puerto de la Cruz Town Council and Aqualia are carrying out the emergency replacement of a deteriorated section of the Punta Brava sewer collector to prevent failures and possible coastal discharges. According to municipal and Aqualia representatives, the new pipe is already installed and complementary works continue with the sewer system operational.
Timeline
30 Sept 2026
Aqualia details replacement materials and method
According to Aqualia, the intervention replaced an elevated cast-iron pipe with a fibre pipe to extend its service life, using manual work to prevent materials from falling.
30 Sept 2026
New pipe installed; complementary works continue
According to municipal and Aqualia representatives, the new pipe for the Punta Brava sewer collector is already installed and complementary works continue while the sewer system remains operational.
30 Sept 2026
Request for clarification on Playa Jardín analyses
Puerto de la Cruz Town Council says it has requested a technical explanation from Public Health about discrepancies with the results of the municipal laboratory contracted for Playa Jardín and states that it continues the preventive replacement of the Punta Brava collector, cleaning and monitoring through independent analyses.
25 Sept 2026
Updated 30 Sept 2026
Puerto de la Cruz · Tenerife
Puerto de la Cruz Town CouncilPublic institutions
The Sustainable City department of Puerto de la Cruz Town Council has formally requested explanations from the Tenerife Island Water Council, the project promoter and responsible body, and from the contractor carrying out the works, regarding incidents detected during the expansion works at the Punta Brava wastewater treatment plant (Valle de La Orotava regional WWTP). Complaints from residents of the neighbouring Los Frailes housing estate include noise, damage to flora, rubble dumping, bad smells and excess dust. The council asks why the works do not comply with the project's environmental assessment (DAP), which required prior flora and fauna studies, and calls for transplant protocols for the affected Canarian plant species.
21 Sept 2026
Punta Brava treatment plant (Valle de La Orotava) · Puerto de la Cruz · Tenerife
Puerto de la Cruz Town CouncilOrganiser
Tenerife Island Water CouncilAuthority addressed
Residents of Los FrailesCivil society
A technical report by the Tenerife Island Water Council, dated 18 August 2026, concludes that repairing the existing Punta Brava submarine outfall is not sufficient. According to Canarias Ahora / elDiario.es, published on 21 September 2026, the alternatives studied for repairing the existing infrastructure do not provide an adequate structural solution. Technicians propose constructing a new submarine outfall along a different route, while temporary measures remain in place and wastewater treatment is improved. The proposal does not mean the new infrastructure has been approved, funded or started. On 23 September 2026, El Día reported that the awarded repair of about 240 metres of the outfall (awarded to Ferrovial for €2.7 million) must be reconsidered, as the water council's report rejects the studied alternatives as viable solutions. The same day, Cabildo president Rosa Dávila said the island council would follow whatever solution the water council's technicians determine, including a new outfall if they recommend it (Diario de Avisos). No replacement outfall has been approved, funded or started.
21 Sept 2026
Playa Jardín / Punta Brava, Puerto de la Cruz · Puerto de la Cruz · Tenerife
Tenerife Island Water CouncilImplementing body
Cabildo de Tenerife (island council)Public institutions
Residents of Los Frailes have reported dust, noise and a lack of information during the expansion works at the Punta Brava treatment plant, according to Diario de Avisos. Concerns were also raised regarding earth movements, debris and possible effects on vegetation. Fundación Telesforo Bravo has announced that it will request information about the works and the corresponding permits.
20 Sept 2026
Los Frailes / Punta Brava · Puerto de la Cruz · Tenerife
Residents of Los FrailesCivil society
Telesforo Bravo FoundationCivil society
Asamblea Ciudadana Portuense has proposed creating a joint sanitation coordination group involving Puerto de la Cruz, La Orotava, Los Realejos and Santa Úrsula to coordinate assessments, needs and actions related to the regional wastewater system.
The proposal calls for stronger coordination between municipalities and closer monitoring of sanitation infrastructure and water quality. It is a civil society initiative and has not been approved as an official government programme.
19 Sept 2026
Valle de La Orotava · Puerto de la Cruz · Orotava (La) · Realejos (Los) · Santa Úrsula · Tenerife
Asamblea Ciudadana PortuenseOrganiser
The municipality reported completion of the new sanitation connection allowing wastewater from La Vera, Las Adelfas and upper Los Frailes to flow directly towards the regional EDAR, reducing pressure on coastal pumping stations and the coastal sanitation network.
31 Jul 2026
Puerto de la Cruz · Tenerife
Puerto de la Cruz Town CouncilImplementing body
The Punta Brava residents' platform Stop Vertidos al Mar described as "very worrying" that Puerto de la Cruz Town Council did not report a microbiological contamination episode detected at Playa Jardín between 22 and 24 June 2026, nor take preventive measures while water quality was being assessed. Its president, Tania Hernández, argued for transparency when public health is at stake. The platform maintains that the structural sanitation problems at Playa Jardín remain not fully resolved and that some of the committed works are still incomplete or delayed. Recorded as civic action; it is not a scored incident.
29 Jul 2026
Playa Jardín · Punta Brava · Puerto de la Cruz · Tenerife
Stop Sea Discharges PlatformOrganiser
Puerto de la Cruz Town CouncilAuthority addressed
Construction started on a new sanitation connection allowing wastewater from La Vera, Las Adelfas and upper Los Frailes to be sent towards the regional treatment system instead of passing through coastal pumping infrastructure. The aim is to reduce pressure on the coastal network and lower the risk of overflow discharges.
2 Mar 2026
Puerto de la Cruz · Tenerife
Puerto de la Cruz Town CouncilImplementing body
In February 2026 it was reported that court number 2 of the Puerto de la Cruz Court of Instance was investigating five public officials over an alleged environmental offence linked to the sewage discharges at Playa Jardín, in preliminary proceedings opened following a complaint by the Environmental Prosecutor's Office of Santa Cruz de Tenerife after almost a year in which bathing was advised against. A subsequent order of 12 March 2026 provisionally dismissed and closed the case for two of those investigated, councillors David Hernández and Alberto Cabo, finding no indications against them as they held no sanitation responsibilities. Proceedings continued against the other three: Blanca Pérez (Cabildo councillor and CIATF vice-president), Marco Antonio González (former mayor of Puerto de la Cruz) and Javier Davara (CIATF manager). The case is ongoing; there is no conviction.
27 Feb 2026
Playa Jardín · Puerto de la Cruz · Tenerife
Environmental Prosecutor's Office of Santa Cruz de TenerifeOrganiser
Puerto de la Cruz Town CouncilAuthority addressed
Tenerife Island Water CouncilAuthority addressed
The Ayuntamiento approved the procurement process for the new water and sanitation concession, including approximately €28.4 million in initial investments for 2026–2027. Planned measures include improvements to wastewater pumping stations, overflow systems and hydraulic infrastructure in Punta Brava.
10 Feb 2026
Puerto de la Cruz · Tenerife
Puerto de la Cruz Town CouncilOrganiser
The Government of the Canary Islands processed the amendment to the discharge authorisation for the Valle de La Orotava WWTP via the Punta Brava outfall. Rehabilitation works on the outfall were awarded for €2.7 million; in June 2026, the Directorate-General for Environmental Quality stated in response to objections that, following permits and preparatory filtration well works, completion is now estimated for approximately December 2027.
Investment: Adjudicación de la rehabilitación / Rehabilitation award
10 Oct 2025
Puerto de la Cruz · Tenerife
Directorate-General for Environmental QualityOrganiser
Tenerife Island Water CouncilImplementing body
Puerto de la Cruz advanced the Plan Director de Abastecimiento y Saneamiento, including the preliminary construction and operation project and the investment programme for the future water and sanitation concession.
9 Jul 2025
Puerto de la Cruz · Tenerife
Puerto de la Cruz Town CouncilOrganiser
The Cabildo is advancing six major hydraulic projects across Tenerife as part of a sanitation and wastewater treatment programme aimed at improving wastewater treatment, reducing discharges into the sea and increasing the reuse of treated water.
2 Jul 2025
Tenerife · Granadilla de Abona · Guía de Isora · Santa Cruz de Tenerife · San Cristóbal de La Laguna · Rosario (El) · Puerto de la Cruz · Orotava (La) · Realejos (Los) · Arafo · Güímar · Candelaria
Cabildo de Tenerife (island council)Public institutions
ACUAES (Aguas de las Cuencas de España)Public institutions
Tenerife Island Water CouncilPublic institutions
The Cabildo approved €33.6 million to advance six major hydraulic infrastructure projects across Tenerife, including sanitation measures intended to reduce wastewater discharges.
This infrastructure action does not in itself imply any change in current bathing-water quality.
2 Jul 2025
Granadilla de Abona · Guía de Isora · Santa Cruz de Tenerife · San Cristóbal de La Laguna · Rosario (El) · Puerto de la Cruz · Orotava (La) · Realejos (Los) · Arafo · Güímar · Candelaria · Tenerife
Cabildo de Tenerife (island council)Public institutions
ACUAES (Aguas de las Cuencas de España)Public institutions
Tenerife Island Water CouncilPublic institutions
The Ayuntamiento reported continued sanitation and stormwater cleaning works in Punta Brava. Measures included new pumps, overflow monitoring and work on the coastal collector as part of efforts to improve the wastewater system affecting the Playa Jardín area.
23 May 2025
Puerto de la Cruz · Tenerife
Puerto de la Cruz Town CouncilImplementing body
A May 2025 report compiled the sanction proceedings opened by the Canary Islands Agency for the Protection of the Natural Environment against Puerto de la Cruz Town Council for discharges to the sea, then totalling around EUR 45,000 in acknowledged fines, including proceedings over the overflow outlets at Playa Jardín, Playa Chica and El Caletón, plus earlier sanctions from 2018 and 2022. The Tenerife Island Water Council was also sanctioned. The report traces the origin of the problem to the break in the Valle de La Orotava district treatment plant outfall since July 2020 and notes that the municipality's main beaches remained closed for close to a year. It is recorded as context and accountability reporting; it creates no new scored incident.
20 May 2025
Playa Jardín · Playa Chica · El Caletón · Puerto de la Cruz · Realejos (Los) · Orotava (La) · Tenerife
Canary Islands Agency for the Protection of the Natural EnvironmentOrganiser
Puerto de la Cruz Town CouncilAuthority addressed
The organisation added the Playa Jardín case to its water-conflict register, documenting wastewater pollution and Tenerife sanitation context.
17 May 2025
Puerto de la Cruz · Tenerife
Ecologists in ActionCivil society
Works at the Valle de La Orotava treatment plant in Punta Brava will allow up to 6,600 cubic metres per day of regenerated water to be supplied to the La Cruz Santa reservoir for agricultural irrigation in Los Realejos and the Valle de La Orotava. Phase 1 already uses membrane bioreactor (MBR) secondary treatment, and phase 2, under way, adds reverse electrodialysis tertiary treatment. Balten is building the connecting pipeline between the plant and the reservoir; pumping was expected to start in June 2025.
22 Apr 2025
La Cruz Santa reservoir · Los Realejos · Valle de La Orotava treatment plant · Puerto de la Cruz · Tenerife
Los Realejos Town CouncilOrganiser
Cabildo de Tenerife (island council)Implementing body
The Stop Sea Discharges Platform organised a demonstration in Puerto de la Cruz calling for solutions to coastal pollution and the recovery of Playa Jardín.
The mobilisation addressed the authorities with relevant responsibilities, including Puerto de la Cruz Town Council, the Cabildo de Tenerife and the Government of the Canary Islands. This record documents public pressure; it is not a bathing-water incident.
23 Mar 2025
Playa Jardín · Puerto de la Cruz · Tenerife
Stop Sea Discharges PlatformOrganiser
Cabildo de Tenerife (island council)Authority addressed
Government of the Canary IslandsAuthority addressed
Puerto de la Cruz Town CouncilAuthority addressed
More than a thousand people took part in a mobilisation called by the Plataforma Stop Vertidos al Mar to demand solutions to the sanitation and discharge problems raised in relation to Playa Jardín.
Record of a citizen mobilisation; it is neither an administrative complaint nor an official action.
1 Mar 2025
Playa Jardín · Puerto de la Cruz · Tenerife
Stop Sea Discharges PlatformOrganiser
The platform filed a formal complaint concerning discharges on the Puerto de la Cruz coast and requested a review of pumping and treatment facilities.
15 Jan 2025
Puerto de la Cruz · Tenerife
Stop Sea Discharges PlatformCivil society
The wider Tenerife sanitation programme was expanded to cover major regional systems including Arona Este, Tenerife Oeste, Acentejo, Granadilla and Valle de La Orotava, together with further works in Puerto de la Cruz and future infrastructure in Isla Baja.
This infrastructure action does not in itself imply any change in current bathing-water quality.
9 Jan 2025
San Cristóbal de La Laguna · Tegueste · Tacoronte · Santa Cruz de Tenerife · Arico · Puerto de la Cruz · Icod de los Vinos · La Guancha · San Juan de la Rambla · Tenerife
Cabildo de Tenerife (island council)Public institutions
Ministry for the Ecological Transition and Demographic ChallengePublic institutions
ACUAES (Aguas de las Cuencas de España)Public institutions
The council started procurement for a set of corrective measures worth around €8 million. The first measure disconnects surplus surface water in La Vera–Las Adelfas, estimated at about €150,000.
Investment: Alrededor de 8 millones de euros; primera medida de unos 150.000 euros
19 Dec 2024
Puerto de la Cruz · Tenerife
Puerto de la Cruz Town CouncilPublic institutions
The island water council used a submarine robot over three days to measure the length of the crack in the outfall, after mortar injection had failed.
31 Oct 2024
Puerto de la Cruz · Tenerife
Tenerife Island Water CouncilPublic institutions
A municipal compatibility report allows the tender for the expansion of the Punta Brava district treatment plant, valued at €20.8 million with a 24-month construction period.
Investment: 20,8 millones de euros y 24 meses de ejecución
5 Oct 2024
Puerto de la Cruz · Tenerife
Tenerife Island Water CouncilPublic institutions
The Cabildo de Tenerife allocates €1 million and the regional ecological transition department contributes €300,000 to connect homes to the sewer network and upgrade it in Punta Brava.
Investment: 1 millón del Cabildo y 300.000 euros del Gobierno de Canarias
2 Oct 2024
Puerto de la Cruz · Tenerife
Government of the Canary IslandsPublic institutions
Platform and town council representatives reviewed reports and measures proposed by the responsible public bodies following the bathing-area closure.
7 Aug 2024
Puerto de la Cruz · Tenerife
Stop Sea Discharges PlatformCivil society
Puerto de la Cruz Town CouncilPublic institutions
Construction of the main Valle de La Orotava sanitation collectors reached an advanced stage, including works associated with the Cuesta de la Villa pumping station and the infrastructure needed to convey wastewater toward the regional treatment system.
This infrastructure action does not in itself imply any change in current bathing-water quality.
8 May 2024
La Orotava, Los Realejos and Puerto de la Cruz · Orotava (La) · Realejos (Los) · Puerto de la Cruz · Tenerife
ACUAES (Aguas de las Cuencas de España)Public institutions
Cabildo de Tenerife (island council)Public institutions
Tenerife Island Water CouncilPublic institutions
The planned Valle de La Orotava wastewater system was designed to significantly increase regional treatment capacity. Main collectors in La Orotava and Los Realejos were already under construction and the first treatment-plant phase was designed for around 10,000 cubic metres per day.
This infrastructure action does not in itself imply any change in current bathing-water quality.
14 Nov 2022
Valle de La Orotava · La Orotava · Orotava (La) · Puerto de la Cruz · Realejos (Los) · Santa Úrsula · Tenerife
Tenerife Island Water CouncilPublic institutions