Municipality

Water quality in Arona

MiCharco brings together official measurements, classifications and recorded incidents for the 4 bathing zones of Arona, Tenerife. All data comes from official sources, with a direct link to each original source.

Bathing areas
4
With an active situation
0
Last updated
1 Nov 2026

In addition, there are 17 recorded public actions related to sanitation, wastewater treatment and coastal infrastructure in Arona. See what's being done

Bathing zones in Arona

View on the map
4 monitored bathing zones

Playa de las Galletas

Arona · South

Good90
Latest test
19 Oct 2026 · 18 days ago
Microbiology
E. coli 29 · Ent. 6
Latest official status
Open
Annual quality
Excellent

Playa de las Vistas

Arona · South

Very good95
Latest test
19 Oct 2026 · 18 days ago
Microbiology
E. coli 9 · Ent. 4
Latest official status
Open
Annual quality
Excellent
Moderate84
Latest test
26 Oct 2026 · 11 days ago
Microbiology
E. coli 9 · Ent. 24
Latest official status
Open
Annual quality
Excellent

Playa del Camisón

Arona · South

Good94
Latest test
19 Oct 2026 · 18 days ago
Microbiology
E. coli 9 · Ent. 1
Latest official status
Open
Annual quality
Excellent

See all Tenerife beaches

Recorded incidents in Arona

See all incidents
Report

Unconfirmed

Arona

Diario de Avisos reports images and accounts from Álvaro Rodríguez and Asier Linares showing overflowing drains and a pipe releasing water into the sea at Palm-Mar, Arona. They report odours, wipes and a possible mixture with wastewater after rain. There is no official confirmation of the water’s composition or contamination of a particular beach. November 1 is the publication date; the exact filming date is not established. Unconfirmed report.

Projects & updates in Arona

See all actions

Tender authorised to complete connections to the Montaña Reverón wastewater treatment plant

ACUAES has authorised a €2,095,269 tender to complete incoming connections to the Montaña Reverón treatment plant, located in Arona and intended to treat wastewater from eastern Arona and San Miguel de Abona. The works have a five-month execution period. Plant trials are expected in summer 2027, followed by progressive commissioning.

Timeline

  1. 27 Oct 2026

    ACUAES details the tender and progress of the systems

    ACUAES authorises a €2,095,269 tender with a five-month execution period for the final incoming pumping pipelines, part of the terrestrial outfall and the access road. The plant is in its final phase, awaiting completion of its electrical connection following Energy Directorate approval. Arona Este is 73% complete, San Miguel 63% and the Palm-Mar connection 25%, with completion expected in mid-2027. Plant trials are expected in summer 2027, followed by progressive receipt of wastewater. Seven- and four-kilometre terrestrial outfalls have been built to connect to the existing submarine outfalls in both municipalities for surplus not sent to the reuse reservoir. These are infrastructure works, not confirmation of contamination.

    ACUAES

Date

27 Oct 2026

Type
Authorised
SEWER NETWORK
Where

Montaña Reverón wastewater treatment plant · Arona · Tenerife

Who

Tenerife Island Water CouncilPublic institutions

ACUAES (Aguas de las Cuencas de España)Implementing body

Las Vistas renovation includes new sewer collector and awaits coastal authority approval

According to sources at the Cabildo de Tenerife, the contract for renovating the Las Vistas promenade in Arona is expected to be awarded in 2027 and depends on coastal authority approval. The project includes a separate stormwater network and a new wastewater collector along a stretch of almost one kilometre.

Date

8 Oct 2026

Type
Under investigation
COASTAL WORKS
Where

Arona · Tenerife

Who

Cabildo de Tenerife (island council)Organiser

Arona Town CouncilPublic institutions

€158 million already executed in Tenerife sanitation programme

ACUAES reported that approximately €158 million had already been executed within the major Tenerife sanitation and wastewater-treatment programme, representing about 67% of planned execution. The update included commissioning work at the Oeste and Los Letrados systems.

This infrastructure action does not in itself imply any change in current bathing-water quality.

Investment: Ejecutados (≈67% de lo previsto) / Executed (≈67% of planned)

Date

20 May 2026

Type
In progress
SANITATIONINFRASTRUCTURE
Where

Guía de Isora · Santiago del Teide · Granadilla de Abona · Arona · San Miguel de Abona · Tenerife

Who

ACUAES (Aguas de las Cuencas de España)Public institutions

Cabildo de Tenerife (island council)Public institutions

Tenerife Island Water CouncilPublic institutions

Los Cristianos loses its Blue Flag over water quality

Los Cristianos beach (Arona) did not receive the Blue Flag for the 2026 season. According to ADEAC, the reason was not achieving an "excellent" water-quality rating in the scientific sampling, one of the required criteria. Arona Town Council stated that the area remained suitable for bathing throughout the period analysed and that in 2025 there were three isolated samplings where the rating moved from "excellent" to "good", never reaching "insufficient". Losing a voluntary award is not a bathing closure and does not affect the historical profile.

Date

7 May 2026

Type
Announced
MONITORING
Where

Los Cristianos beach · Arona · Tenerife

Who

Association for Environmental and Consumer Education (ADEAC)Organiser

Arona Town CouncilAuthority addressed

Solar power installation completed at the Adeje–Arona wastewater treatment plant

A photovoltaic self-consumption installation at the Adeje–Arona wastewater treatment plant was completed in May 2026. The project had an awarded value of approximately €442,980 and reduces the external electricity demand of the wastewater treatment infrastructure.

The installation supports wastewater treatment infrastructure but does not by itself imply a change in bathing water quality.

Investment: Valor de adjudicación: 442.980 euros

Date

May 2026

Type
Completed
TREATMENT
Where

Adeje · Arona · Tenerife

Who

Tenerife Island Water CouncilPublic institutions

New five-year operation and investment programme for the Adeje–Arona wastewater system

The Tenerife Island Water Council awarded a five-year contract covering the operation, maintenance and conservation of the Adeje–Arona regional wastewater treatment and reclaimed water system, together with the planned investment and equipment required for the system.

This measure concerns regional wastewater infrastructure and does not by itself indicate current bathing water quality.

Date

27 Mar 2026

Type
Contract awarded
SANITATIONTREATMENT
Where

Adeje · Arona · Tenerife

Who

Tenerife Island Water CouncilPublic institutions

Report on the southern coastline during storm Therese

A press report described the situation along the southern coast of Tenerife (Los Cristianos, Las Vistas, El Camisón and Playa de las Américas) during storm Therese, with debris and wipes in the water and accounts from lifeguards and beachgoers. The article expressly states that the beaches remained open under red flags and were not sealed off. It also notes that the Ministry of Health recorded at least 29 short-duration contamination incidents in the Canary Islands in 2024. No official bathing ban is documented for this episode, so the entry is recorded as context and affects no score.

Date

25 Mar 2026

Type
Announced
MONITORING
Where

Los Cristianos · Las Vistas · El Camisón · Playa de las Américas · Arona · Adeje · Tenerife

Who
—

La Camella residents call for a sewer connection after years of foul-water problems

Residents of La Camella have called for a solution for several homes that, according to them, still depend on septic systems, and report recurring wastewater overflows. The residents are asking to be effectively connected to the sewer network.

The statements recorded here are those of the residents and are not an official finding.

Date

3 Mar 2026

Type
Active public complaint
CITIZEN ACTION
Where

La Camella · Arona · Tenerife

Who

La Camella residentsOrganiser

CJEU finds further breaches of the EU Urban Waste Water Treatment Directive affecting Tenerife

The Court of Justice of the European Union ruled that Spain had failed to fulfil several obligations under Directive 91/271/EEC in a number of agglomerations covered by case C-433/23, several of them located in Tenerife. The judgment concerns obligations linked to the collection, treatment and monitoring of urban waste water.

A European judgment records past failures and requires them to be corrected. It does not by itself state the situation at any beach on the day it is consulted.

Date

18 Dec 2025

Type
Court judgment
EU COMPLIANCE
Where

Adeje · Arona · Candelaria · Granadilla de Abona · Guía de Isora · Rosario (El) · Santiago del Teide · San Cristóbal de La Laguna · Santa Cruz de Tenerife · Tenerife

Who

European Union – Court of Justice of the European UnionPublic institutions

Palm Mar sanitation connection works awarded

ACUAES awarded the works to connect Palm Mar to the regional sanitation system. The project includes a new wastewater pumping station and around 4.5 kilometres of pipeline to the Montaña Reverón treatment system.

This infrastructure action does not in itself imply any change in current bathing-water quality.

Investment: Aproximado / Approximate

Date

27 Nov 2025

Type
Contract awarded
SANITATIONSEWER NETWORK
Where

Palm Mar · Arona · Tenerife

Who

ACUAES (Aguas de las Cuencas de España)Public institutions

Tender for works to treat Palm-Mar wastewater at the Montaña Reverón plant

ACUAES authorised the tender documents for a new pumping station and a pipeline of about 4.5 kilometres. The works connect Palm-Mar to the sanitation system instead of keeping its current discharge.

Investment: 4.485.956 euros de obra más 298.853 euros de dirección

Date

24 Jul 2025

Type
Announced
SEWER NETWORK
Where

Arona · Tenerife

Who

ACUAES (Aguas de las Cuencas de España)Public institutions

Adeje–Arona wastewater pumping stations undergo operational testing

The Tenerife Island Water Council carried out operational tests at the main Adeje–Arona wastewater pumping stations and relief infrastructure, including Puerto, Las Vistas, Barranco de Troya and Torviscas.

This infrastructure action does not in itself imply any change in current bathing-water quality.

Date

17 Jul 2025

Type
In progress
INVESTIGATION / MONITORINGSANITATION
Where

Adeje and Arona · Adeje · Arona · Tenerife

Who

Tenerife Island Water CouncilPublic institutions

Mobilisation against marine discharges at Playa Honda–Las Américas

ATAN and Alianza Local organised a demonstration calling for transparency and action on polluting discharges along Tenerife’s southern tourist coast.

The event focused on Playa Honda and the Las Américas area. This record documents civil-society action; it is not a bathing-water incident.

Date

25 May 2025

Type
Completed
PUBLIC PRESSURE
Where

Playa Honda · Las Américas · Arona · Tenerife

Who

Tenerife Friends of Nature Association (ATAN)Organiser

Alianza LocalOrganiser

New EU court action includes numerous Tenerife wastewater agglomerations

A new action brought by the European Commission before the Court of Justice covers numerous agglomerations in Tenerife for possible failures to meet obligations on the collection and treatment of urban waste water. The agglomerations cited include Buenavista del Norte, El Sauzal, Garachico-La Caleta, Icod de los Vinos, La Matanza, La Victoria, Las Galletas-Las Rosas, Radazul, San Miguel, Tabaiba, Tamaimo and Valle San Lorenzo.

The list of agglomerations cited is not necessarily complete. A pending procedure does not by itself mean a beach is closed or that a specific point is currently polluted.

Date

3 Sept 2024

Type
Under investigation
EU COMPLIANCE
Where

Arona · Buenavista del Norte · El Sauzal · Garachico · Icod de los Vinos · La Matanza de Acentejo · La Victoria de Acentejo · Rosario (El) · San Miguel de Abona · Tenerife

Who

European Union – Court of Justice of the European UnionPublic institutions

Montaña Reverón sanitation network expands through San Miguel and Arona

Works continued on the Arona Este–San Miguel sanitation system, including wastewater pumping and collector infrastructure around Tamaide, Las Chafiras, Las Galletas and Guaza linked to the Montaña Reverón treatment system.

This infrastructure action does not in itself imply any change in current bathing-water quality.

Date

8 May 2024

Type
In progress
SANITATIONSEWER NETWORK
Where

San Miguel de Abona and Arona · San Miguel de Abona · Arona · Tenerife

Who

ACUAES (Aguas de las Cuencas de España)Public institutions

European Commission refers Spain to the CJEU over wastewater failures affecting Tenerife

The European Commission took Spain to the Court of Justice of the European Union over failures to comply with Directive 91/271/EEC on urban waste water treatment. The case covers several agglomerations in Tenerife, among them Adeje-Arona, Añaza, Candelaria, Golf del Sur, Guía de Isora Litoral, La Esperanza-La Laguna Sur-Santa Cruz-Valles, Puerto de Santiago-Playa la Arena, San Isidro-Litoral, Sueño Azul and Valle de la Orotava.

An infringement procedure is brought against Spain and describes unfulfilled obligations at agglomeration level, not the water quality at a beach on a given day. The required works and connections fall to different administrations.

Date

12 Jul 2023

Type
Under investigation
EU COMPLIANCE
Where

Adeje · Arona · Candelaria · Granadilla de Abona · Guía de Isora · Rosario (El) · Santiago del Teide · San Cristóbal de La Laguna · Santa Cruz de Tenerife · Tenerife

Who

European Union – Court of Justice of the European UnionPublic institutions

Arona East–San Miguel sanitation system. Montaña Reverón wastewater treatment plant

New district treatment plant designed for 240,000 population equivalent, declared of general state interest. The official project record states an estimated investment of €107 million and an execution status.

Investment: Inversión estimada de 107 millones de euros

Date

23 Jun 2020

Type
In progress
TREATMENT
Where

Arona · San Miguel de Abona · Tenerife

Who

Ministry for the Ecological Transition and Demographic ChallengePublic institutions