Playa Candelaria
Candelaria · East
MiCharco brings together official measurements, classifications and recorded incidents for the 3 bathing zones of Candelaria, Tenerife. All data comes from official sources, with a direct link to each original source.
In addition, there are 12 recorded public actions related to sanitation, wastewater treatment and coastal infrastructure in Candelaria. See what's being done
| Latest official status | ||||||
|---|---|---|---|---|---|---|
Candelaria · East | Moderate88 | Open | 27 Oct 2026 10 days ago | E. coli30 Ent.16 | Good | 235 mUnauthorised |
Candelaria · East | Good92 | Open | 21 Sept 2026 46 days ago | E. coli9 Ent.9 | Excellent | 43 mUnauthorised |
Candelaria · East | Moderate89 | Open | 30 Sept 2026 37 days ago | E. coli23 Ent.29 | Excellent | 193 mUnauthorised |
Candelaria · East
Candelaria · East
Candelaria · East
| Location | Status | Description | Source | |
|---|---|---|---|---|
| 7 Jul 2026 | Candelaria | Report | Brown patches were reported along the Candelaria coastline near Las Caletillas. The origin was not officially confirmed, and the bathing area remained open while additional water samples were taken. |
Brown patches were reported along the Candelaria coastline near Las Caletillas. The origin was not officially confirmed, and the bathing area remained open while additional water samples were taken.
Candelaria Town Council has started improvement works around Playa de Olegario, following the contract award in September. The project includes stormwater drainage upgrades, renewal of sewer connections and water-supply networks, accessibility improvements and repaving of the waterfront. The investment is €895,324.96, with an expected execution period of eight months.
Investment: Adjudicación: 836.752,30 € + 58.572,66 € de IGIC / Award: €836,752.30 + €58,572.66 IGIC.
Timeline
26 Oct 2026
Drainage and sanitation improvement works begin at Playa de Olegario
Candelaria Town Council announced the start of works on Monday 26 October. The total investment is €895,324.96 and the expected execution period is eight months. Works include drainage improvements on Calle La Piscina, renewal of water-supply and irrigation networks and sewer connections, accessibility improvements, and repaving of the waterfront and the sidewalk on Calle La Piscina.
29 Sept 2026
Playa de Olegario refurbishment contract awarded
The council announced the award to Construplan y Planificación S.L.U. for €836,752.30 plus €58,572.66 IGIC. The project covers drainage, water-supply and irrigation networks, sewer connections, accessibility and waterfront repaving, with an eight-month execution period.
29 Sept 2026
Updated 26 Oct 2026
Playa de Olegario · Candelaria · Tenerife
Candelaria Town CouncilOrganiser
According to the published reports, in August 2026 the public prosecutor filed charges against four mayors and former mayors over discharges from the Valle de Güímar industrial estate: Carmen Luisa Castro (mayor of Güímar), María Concepción Brito (mayor of Candelaria), José Gumersindo García Trujillo (former mayor of Candelaria) and José Juan Lemes Expósito (former mayor of Arafo). The alleged offences are dereliction of duty by omission and an environmental offence, with four years in prison and thirteen years of disqualification sought. The trial is set for 8 February 2027 at the Provincial Court. These are charges awaiting trial, not proven facts. No specific beach is identified and no official closure order is linked to these proceedings.
26 Aug 2026
Valle de Güímar industrial estate · Güímar · Candelaria · Arafo · Tenerife
Environmental Prosecutor's Office of Santa Cruz de TenerifeOrganiser
Güímar Town CouncilAuthority addressed
Candelaria Town CouncilAuthority addressed
The Canary Islands Government announced the forthcoming tender of the new San Blas wastewater pumping station and its connection to the Valle de Güímar treatment plant. This is a later implementation milestone following the funding and cooperation agreement already announced in March 2026.
This infrastructure action does not in itself imply any change in current bathing-water quality.
24 Jun 2026
Candelaria · Tenerife
Government of the Canary IslandsPublic institutions
Official documentation from the Government of the Canary Islands states that the coastal agglomerations Candelaria-Caletillas, Candelaria-Punta Larga and Candelaria Casco are included in infringement procedure 2016/2134 concerning Directive 91/271/EEC. Sanitation works and connection to the Valle de Güímar system form part of the measures intended to resolve these failures.
The information comes from a Canary administrative document that cites the European procedure. It does not describe water quality at a given moment.
9 Apr 2026
Candelaria · Tenerife
Government of the Canary IslandsPublic institutions
Agreement between the Cabildo de Tenerife, the Canary Islands Government, the island water council and Candelaria town council to build the San Blas pumping station and the pipeline to the Valle de Güímar treatment plant. The total budget is €8,384,906.06, fully funded by the regional government across 2026, 2027 and 2028.
Investment: 8.384.906,06 euros en las anualidades 2026-2028
4 Mar 2026
Candelaria · Tenerife
Cabildo de Tenerife (island council)Public institutions
The Court of Justice of the European Union ruled that Spain had failed to fulfil several obligations under Directive 91/271/EEC in a number of agglomerations covered by case C-433/23, several of them located in Tenerife. The judgment concerns obligations linked to the collection, treatment and monitoring of urban waste water.
A European judgment records past failures and requires them to be corrected. It does not by itself state the situation at any beach on the day it is consulted.
18 Dec 2025
Adeje · Arona · Candelaria · Granadilla de Abona · Guía de Isora · Rosario (El) · Santiago del Teide · San Cristóbal de La Laguna · Santa Cruz de Tenerife · Tenerife
European Union – Court of Justice of the European UnionPublic institutions
Candelaria Town Council and the Cabildo de Tenerife completed sanitation works in three coastal areas of the municipality, carried out to address insufficient or missing sewer infrastructure. The works improved wastewater collection along the coast and included a new pumping station and pressure pipeline, with an investment of approximately €837,967.
The completion of sanitation infrastructure does not by itself indicate the current bathing-water quality of nearby beaches.
Investment: 837.967,44 euros / €837,967.44
17 Oct 2025
Calle La Galera · Comunidad Guaimara · Las Caletillas · Avenida Marítima · Candelaria · Tenerife
Candelaria Town CouncilPublic institutions
Cabildo de Tenerife (island council)Public institutions
The Cabildo is advancing six major hydraulic projects across Tenerife as part of a sanitation and wastewater treatment programme aimed at improving wastewater treatment, reducing discharges into the sea and increasing the reuse of treated water.
2 Jul 2025
Tenerife · Granadilla de Abona · Guía de Isora · Santa Cruz de Tenerife · San Cristóbal de La Laguna · Rosario (El) · Puerto de la Cruz · Orotava (La) · Realejos (Los) · Arafo · Güímar · Candelaria
Cabildo de Tenerife (island council)Public institutions
ACUAES (Aguas de las Cuencas de España)Public institutions
Tenerife Island Water CouncilPublic institutions
The Cabildo approved €33.6 million to advance six major hydraulic infrastructure projects across Tenerife, including sanitation measures intended to reduce wastewater discharges.
This infrastructure action does not in itself imply any change in current bathing-water quality.
2 Jul 2025
Granadilla de Abona · Guía de Isora · Santa Cruz de Tenerife · San Cristóbal de La Laguna · Rosario (El) · Puerto de la Cruz · Orotava (La) · Realejos (Los) · Arafo · Güímar · Candelaria · Tenerife
Cabildo de Tenerife (island council)Public institutions
ACUAES (Aguas de las Cuencas de España)Public institutions
Tenerife Island Water CouncilPublic institutions
More than €40 million was being invested in sanitation and wastewater treatment across the Valle de Güímar, including the regional treatment plant, pumping systems and municipal sewer infrastructure.
This infrastructure action does not in itself imply any change in current bathing-water quality.
Investment: Más de / More than
1 Apr 2025
Güímar, Candelaria and Arafo · Güímar · Candelaria · Arafo · Tenerife
Cabildo de Tenerife (island council)Public institutions
Tenerife Island Water CouncilPublic institutions
The European Commission took Spain to the Court of Justice of the European Union over failures to comply with Directive 91/271/EEC on urban waste water treatment. The case covers several agglomerations in Tenerife, among them Adeje-Arona, Añaza, Candelaria, Golf del Sur, Guía de Isora Litoral, La Esperanza-La Laguna Sur-Santa Cruz-Valles, Puerto de Santiago-Playa la Arena, San Isidro-Litoral, Sueño Azul and Valle de la Orotava.
An infringement procedure is brought against Spain and describes unfulfilled obligations at agglomeration level, not the water quality at a beach on a given day. The required works and connections fall to different administrations.
12 Jul 2023
Adeje · Arona · Candelaria · Granadilla de Abona · Guía de Isora · Rosario (El) · Santiago del Teide · San Cristóbal de La Laguna · Santa Cruz de Tenerife · Tenerife
European Union – Court of Justice of the European UnionPublic institutions
CIATF reported completion during this programme period of major Valle de Güímar infrastructure including Phase I of the regional wastewater treatment plant, the industrial treatment facility and the Arafo–Güímar TF-525 wastewater collector.
This infrastructure action does not in itself imply any change in current bathing-water quality.
2023
Güímar, Arafo and Candelaria · Güímar · Arafo · Candelaria · Tenerife
Tenerife Island Water CouncilPublic institutions